Horse Barns in Woodbine 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

A good horse barn gives you shelter, storage and enough room to handle everyday chores without everything feeling crowded. Benton Metal Depot supplies agricultural building materials for properties in Woodbine and nearby communities, with a lead time of 1 to 2 weeks. Knowing this gives you a starting point for planning the rest of the project.

Key Points

  • ◦Benton Metal Depot is approximately 129 miles from Woodbine.
  • ◦Current lead time for horse barn materials to Woodbine is 1 to 2 weeks.
  • ◦In Woodbine, a permit from Camden County Office of Planning & Development is required once the barn exceeds Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development. square feet.
  • ◦Horse barn exterior materials are available in 7 colors.
  • ◦Plan stall dimensions around the horses that will actually use them.

At a Glance

Permit threshold Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development.
As of 2026 · Source
Setback (side/rear) 15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed.
As of 2026 · Source
Wind load zone Coastal Georgia (St. Marys/Kingsland) — general secondary sources place coastal GA in the ~130 mph (ASCE 7-22, Risk Category II) band, similar to Chatham/Glynn/McIntosh, but no Camden-specific primary map figure was found. Must be confirmed with a GA-licensed engineer or the county building official before publishing.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 148
As of 2026 · Source

Permits & Setbacks in Camden County

Check the building rules before you settle on a location for the barn. Horse barn permit requirements in Woodbine are handled by Camden County Office of Planning & Development. The current threshold is Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development. square feet, but building size may not be the only consideration. Zoning, setbacks and how the property will be used can also affect the project. Confirm those details before preparing the site or beginning permanent construction work.

Delivery to Woodbine

Don't wait until the barn materials are ready to start thinking about the site. Customers in Woodbine are currently looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is about 129 miles away. Use that time to coordinate contractors and prepare the area where materials will be received.

Metal horse barn by Benton Metal Depot

Representative product photo — a Camden County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Should a horse barn have insulation?

That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.

How many colors are available for a horse barn?

Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.

Do I need a permit for a horse barn in Woodbine?

The requirements for Woodbine are handled by Camden County Office of Planning & Development. Currently, a permit is required once the barn exceeds Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development. square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.

What size should horse stalls be?

Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.

How close can I build a horse barn to my property line?

The current setback in Woodbine is 15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed., subject to the requirements of Camden County Office of Planning & Development and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.

What kind of floor is best for a horse barn?

Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.

Can I add a tack room and wash area to my horse barn?

Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.

Is a metal horse barn too hot for Georgia summers?

A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Woodbine, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.

Definitions

◦ Dutch Door
A door divided into upper and lower sections that can open separately. Some horse barns use them for stall or exterior access.
◦ Center Aisle
A passageway running through the barn, usually with stalls or other rooms along one or both sides.
◦ Panel Gauge
A measurement related to sheet-metal thickness.
◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.
◦ Setback
The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
◦ Roof Pitch
The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
◦ Horse Stall
An individual enclosed space inside a barn where a horse can rest, eat and be housed.
◦ Wash Stall
An area designed for washing or grooming horses, with suitable water access, drainage and slip-resistant footing.
◦ Stall Partition
A wall or divider separating one horse stall from another or from an adjacent area.
◦ Tack Room
A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.

Woodbine, Camden County — At a Glance

Permit Authority Name
Camden County Office of Planning & Development
Permit Authority Url
https://www.camdencountyga.gov/102/Permits
Permit Threshold Sqft
Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development.
Setback Feet Side Rear
15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed.
Wind Load Zone
Coastal Georgia (St. Marys/Kingsland) — general secondary sources place coastal GA in the ~130 mph (ASCE 7-22, Risk Category II) band, similar to Chatham/Glynn/McIntosh, but no Camden-specific primary map figure was found. Must be confirmed with a GA-licensed engineer or the county building official before publishing.
Coastal
1
Drive Miles
129
Drive Minutes
148
Nearby Towns
Seals, Colesburg, Clarks Bluff, Tompkins
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal building products in Statesboro since 2004 and supplies materials for agricultural projects throughout the region. For someone planning a horse barn in Woodbine, that means working with a regional supplier familiar with metal roofing, siding and the materials used on farm buildings. The barn's design and animal-housing requirements should be worked out alongside the material specifications.

Ready to talk through your horse barns project in Woodbine?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://www.camdencountyga.gov/102/Permits (2026)
  4. https://www.co.camden.ga.us/ArchiveCenter/ViewFile/Item/644 (Unified Development Code) and https://www.camdencountyga.gov/1250/Permit-Fee-Schedule (2026)
  5. Camden County Unified Development Code, Sec. 222(c)(5) — verify against the primary UDC document at https://www.co.camden.ga.us/ArchiveCenter/ViewFile/Item/644 (2026)
  6. Aggregated from windload.solutions and similar secondary sources — no Camden-specific primary map found (2026)
  7. Given/client spec — Camden County (St. Marys/Kingsland) is a coastal Georgia county (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.