Horse Barns in Harrock Hall 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

If you're building a horse barn in Harrock Hall, don't plan around stalls alone. You'll also need to think about airflow, water access, feed, tack and where the horses will enter and leave. Benton Metal Depot supplies metal building materials throughout Chatham, with 7 exterior colors available for applicable packages.

Key Points

  • ◦Current lead time for horse barn materials to Harrock Hall is 1 to 2 weeks.
  • ◦Benton Metal Depot is approximately 58.9 miles from Harrock Hall.
  • ◦In Harrock Hall, a permit from Chatham County Building Safety & Regulatory Services is required once the barn exceeds No explicit sqft exemption found on the county page — it lists "garages, carports... accessory buildings, storage buildings, tool sheds" as requiring permits without stating a size cutoff. Georgia's state minimum code baseline (IRC) exempts one-story detached sheds/playhouses up to 120 sq ft, but it is unconfirmed whether Chatham County enforces that exemption as-is. square feet.
  • ◦Horse barn exterior materials are available in 7 colors.
  • ◦Plan stall dimensions around the horses that will actually use them.

At a Glance

Permit threshold No explicit sqft exemption found on the county page — it lists "garages, carports... accessory buildings, storage buildings, tool sheds" as requiring permits without stating a size cutoff. Georgia's state minimum code baseline (IRC) exempts one-story detached sheds/playhouses up to 120 sq ft, but it is unconfirmed whether Chatham County enforces that exemption as-is.
As of 2026 · Source
Setback (side/rear) Not retrieved — Chatham County has its own zoning ordinance with district-specific setback tables; figures were not found in available search results and need direct lookup.
As of 2026 · Source
Wind load zone Coastal Georgia (Savannah/Chatham County) — commonly cited around 130 mph (3-second gust, ASCE 7-22, Risk Category II), with barrier-island areas (Tybee, Wilmington, Skidaway Islands) potentially reaching or exceeding 140 mph. NOT verified against a primary county map — Georgia adopted the 2024 IBC/IRC (with GA amendments) effective Jan 1, 2026, referencing ASCE 7-22, and the exact mapped speed depends on precise site location and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 74
As of 2026 · Source

Permits & Setbacks in Chatham County

Get the permit questions answered early so they don't hold up the rest of the project. The current permit threshold for a horse barn in Harrock Hall is No explicit sqft exemption found on the county page — it lists "garages, carports... accessory buildings, storage buildings, tool sheds" as requiring permits without stating a size cutoff. Georgia's state minimum code baseline (IRC) exempts one-story detached sheds/playhouses up to 120 sq ft, but it is unconfirmed whether Chatham County enforces that exemption as-is. square feet, with a setback of Not retrieved — Chatham County has its own zoning ordinance with district-specific setback tables; figures were not found in available search results and need direct lookup.. Those requirements fall under Chatham County Building Safety & Regulatory Services. Agricultural buildings can have different rules depending on their use and location, so verify what applies to your property before pouring concrete or completing other permanent site work.

Delivery to Harrock Hall

Once you know what barn you need, the next step is getting the property ready for it. The typical lead time for a horse barn package to Harrock Hall is 1 to 2 weeks. Use that window to handle permits, access and any site preparation. If you're arranging grading or concrete work, coordinate those jobs with the building specifications and expected delivery schedule.

Metal horse barn by Benton Metal Depot

Representative product photo — a Chatham County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Is a metal horse barn too hot for Georgia summers?

A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Harrock Hall, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.

Can I add a tack room and wash area to my horse barn?

Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.

How big should a horse barn be?

Start with the number and size of your horses, then add the space needed for safe handling and daily care. Stalls are only one part of the layout. You'll also need room for aisles, doors, feed, tack and possibly a wash area. If you expect to add horses later, think about that before choosing the building dimensions.

What kind of metal panels does Benton use for horse barns?

The applicable horse barn package uses 29-gauge and 26-gauge Rib panels panels. Metal roofing and siding help enclose the building and protect it from the weather, but panel selection is only part of planning a barn. Ventilation, condensation control and the safety of surfaces horses can reach should also be addressed in the finished design.

How long does it take to get horse barn materials delivered?

Current delivery to Harrock Hall is estimated at 1 to 2 weeks. Use that window to work through permits, contractor schedules and site preparation. Confirm the estimate for your specific order when placing it and planning the overall construction schedule.

Can I store hay and feed inside my horse barn?

You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.

How wide should the aisle in a horse barn be?

The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.

How many colors are available for a horse barn?

Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.

Definitions

◦ Stall Partition
A wall or divider separating one horse stall from another or from an adjacent area.
◦ Panel Gauge
A measurement related to sheet-metal thickness.
◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.
◦ Tack Room
A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
◦ Eave Height
The height of the barn's exterior wall where it meets the lower edge of the roof.
◦ Feed Room
A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
◦ Setback
The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
◦ Roof Pitch
The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
◦ Post-Frame Construction
A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
◦ Center Aisle
A passageway running through the barn, usually with stalls or other rooms along one or both sides.

Harrock Hall, Chatham County — At a Glance

Permit Authority Name
Chatham County Building Safety & Regulatory Services
Permit Authority Url
https://buildingsafety.chathamcountyga.gov/PermitsInspections/WhenPermitsRequired
Permit Threshold Sqft
No explicit sqft exemption found on the county page — it lists "garages, carports... accessory buildings, storage buildings, tool sheds" as requiring permits without stating a size cutoff. Georgia's state minimum code baseline (IRC) exempts one-story detached sheds/playhouses up to 120 sq ft, but it is unconfirmed whether Chatham County enforces that exemption as-is.
Setback Feet Side Rear
Not retrieved — Chatham County has its own zoning ordinance with district-specific setback tables; figures were not found in available search results and need direct lookup.
Wind Load Zone
Coastal Georgia (Savannah/Chatham County) — commonly cited around 130 mph (3-second gust, ASCE 7-22, Risk Category II), with barrier-island areas (Tybee, Wilmington, Skidaway Islands) potentially reaching or exceeding 140 mph. NOT verified against a primary county map — Georgia adopted the 2024 IBC/IRC (with GA amendments) effective Jan 1, 2026, referencing ASCE 7-22, and the exact mapped speed depends on precise site location and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
1
Drive Miles
58.9
Drive Minutes
74
Nearby Towns
Chippewa Terrace, Rio Vista, Beaulieu, Lakeside Park
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal building products in Statesboro since 2004 and supplies materials for agricultural projects throughout the region. For someone planning a horse barn in Harrock Hall, that means working with a regional supplier familiar with metal roofing, siding and the materials used on farm buildings. The barn's design and animal-housing requirements should be worked out alongside the material specifications.

Ready to talk through your horse barns project in Harrock Hall?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://buildingsafety.chathamcountyga.gov/PermitsInspections/WhenPermitsRequired (2026)
  4. https://buildingsafety.chathamcountyga.gov/PermitsInspections/WhenPermitsRequired — needs direct confirmation by phone (912-201-4300) (2026)
  5. https://buildingsafety.chathamcountyga.gov/ — needs direct ordinance lookup (2026)
  6. Aggregated from windload.solutions and similar secondary sources — no primary Chatham County wind map found (2026)
  7. Given/client spec — Chatham County (Savannah) is a coastal Georgia county (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.