Reviewed by the Benton Metal Depot team · Updated
A good horse barn gives you shelter, storage and enough room to handle everyday chores without everything feeling crowded. Benton Metal Depot supplies agricultural building materials for properties in Lehigh and nearby communities, with a lead time of 1 to 2 weeks. Knowing this gives you a starting point for planning the rest of the project.
Key Points
- ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
- ◦The current local setback for a horse barn in Lehigh is Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation..
- ◦Aisle width should allow horses and handlers to move comfortably and safely.
- ◦Ventilation, drainage and access to fresh water should be considered during barn planning.
- ◦Horse barn exterior materials are available in 7 colors.
At a Glance
| Permit threshold |
Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171).
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation.
As of 2026 · Source |
| Wind load zone |
Inland Georgia — roughly 110-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7 edition Coffee County has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels
As of 2026 · Source |
| Drive time from Statesboro |
147
As of 2026 · Source |
Permits & Setbacks in Coffee County
Barn placement is something to figure out before the ground is cleared. If you're planning a horse barn in Lehigh, contact Coffee County Code Enforcement Department about the local requirements. The permit rule applies once the building exceeds Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171). square feet, and the current setback is Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation.. You should also check whether any additional rules apply to keeping horses on the property before committing to a building location.
Delivery to Lehigh
Don't wait until the barn materials are ready to start thinking about the site. Customers in Lehigh are currently looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is about 99.9 miles away. Use that time to coordinate contractors and prepare the area where materials will be received.
Representative product photo — a Coffee County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
What size should horse stalls be?
Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.
How close can I build a horse barn to my property line?
The current setback in Lehigh is Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation., subject to the requirements of Coffee County Code Enforcement Department and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.
Should a horse barn have insulation?
That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.
What kind of floor is best for a horse barn?
Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.
How many colors are available for a horse barn?
Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.
Do I need a permit for a horse barn in Lehigh?
The requirements for Lehigh are handled by Coffee County Code Enforcement Department. Currently, a permit is required once the barn exceeds Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171). square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.
How long does it take to get horse barn materials delivered?
Current delivery to Lehigh is estimated at 1 to 2 weeks. Use that window to work through permits, contractor schedules and site preparation. Confirm the estimate for your specific order when placing it and planning the overall construction schedule.
Can I add a tack room and wash area to my horse barn?
Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.
Definitions
- ◦ Eave Height
- The height of the barn's exterior wall where it meets the lower edge of the roof.
- ◦ Post-Frame Construction
- A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
- ◦ Condensation
- Moisture that forms when humid air contacts a sufficiently cool surface. Poorly managed condensation can cause damp conditions inside a barn.
- ◦ Feed Room
- A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
- ◦ Stall Partition
- A wall or divider separating one horse stall from another or from an adjacent area.
- ◦ Tack Room
- A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
- ◦ Ridge Vent
- A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
- ◦ Roof Pitch
- The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
- ◦ Horse Stall
- An individual enclosed space inside a barn where a horse can rest, eat and be housed.
- ◦ Wash Stall
- An area designed for washing or grooming horses, with suitable water access, drainage and slip-resistant footing.
Lehigh, Coffee County — At a Glance
- Permit Authority Name
- Coffee County Code Enforcement Department
- Permit Authority Url
- https://www.coffeecounty-ga.gov/departments/code_enforcement/index.php
- Permit Threshold Sqft
- Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171).
- Setback Feet Side Rear
- Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation.
- Wind Load Zone
- Inland Georgia — roughly 110-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7 edition Coffee County has adopted and must be confirmed with a GA-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 99.9
- Drive Minutes
- 147
- Nearby Towns
- West Green, Snipesville, Denton, Upton
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has served contractors and property owners from Statesboro since 2004. The company manufactures metal roofing products and uses a single-source coil supplier to help maintain color consistency. For customers building a horse barn in Lehigh, Benton can supply applicable metal roofing and siding materials based on the project's specifications and selected finishes.
Ready to talk through your horse barns project in Lehigh?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
- https://www.coffeecounty-ga.gov/departments/code_enforcement/index.php (2026)
- https://library.municode.com/ga/coffee_county/codes/code_of_ordinances?nodeId=PTIICOOR_APXDLADECO_CH3ZODI (2026)
- General ASCE 7 inland-Georgia range (aggregated secondary sources) — no county-specific or primary map source found (2026)
- Coffee County is inland (south-central GA) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
