Horse Barns in Dale 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

Are you planning on getting a horse barn in Dale? A good way to start is considering the horses and how you'll care for them each day. Their stalls, feed storage, tack and a clear aisle all need room. Benton Metal Depot supplies metal building materials for agricultural projects throughout Beaufort.

Key Points

  • ◦Horse barn exterior materials are available in 7 colors.
  • ◦Plan stall dimensions around the horses that will actually use them.
  • ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
  • ◦The current local setback for a horse barn in Dale is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled..
  • ◦Benton Metal Depot is approximately 100.9 miles from Dale.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
As of 2026 · Source
Wind load zone Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 133
As of 2026 · Source

Permits & Setbacks in Beaufort County

Barn placement is something to figure out before the ground is cleared. If you're planning a horse barn in Dale, contact Beaufort County Community Development Department, Building Codes / Inspections Division about the local requirements. The permit rule applies once the building exceeds 200 square feet, and the current setback is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.. You should also check whether any additional rules apply to keeping horses on the property before committing to a building location.

Delivery to Dale

Once you know what barn you need, the next step is getting the property ready for it. The typical lead time for a horse barn package to Dale is 1 to 2 weeks. Use that window to handle permits, access and any site preparation. If you're arranging grading or concrete work, coordinate those jobs with the building specifications and expected delivery schedule.

Metal horse barn by Benton Metal Depot

Representative product photo — a Beaufort County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Should a horse barn have insulation?

That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.

How long does it take to get horse barn materials delivered?

Current delivery to Dale is estimated at 1 to 2 weeks. Use that window to work through permits, contractor schedules and site preparation. Confirm the estimate for your specific order when placing it and planning the overall construction schedule.

What kind of metal panels does Benton use for horse barns?

The applicable horse barn package uses 29-gauge and 26-gauge Rib panels panels. Metal roofing and siding help enclose the building and protect it from the weather, but panel selection is only part of planning a barn. Ventilation, condensation control and the safety of surfaces horses can reach should also be addressed in the finished design.

How big should a horse barn be?

Start with the number and size of your horses, then add the space needed for safe handling and daily care. Stalls are only one part of the layout. You'll also need room for aisles, doors, feed, tack and possibly a wash area. If you expect to add horses later, think about that before choosing the building dimensions.

What kind of floor is best for a horse barn?

Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.

Is a metal horse barn too hot for Georgia summers?

A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Dale, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.

Can I add a tack room and wash area to my horse barn?

Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.

How close can I build a horse barn to my property line?

The current setback in Dale is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled., subject to the requirements of Beaufort County Community Development Department, Building Codes / Inspections Division and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.

Definitions

◦ Stall Partition
A wall or divider separating one horse stall from another or from an adjacent area.
◦ Tack Room
A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
◦ Panel Gauge
A measurement related to sheet-metal thickness.
◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.
◦ Setback
The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
◦ Roof Pitch
The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
◦ Eave Height
The height of the barn's exterior wall where it meets the lower edge of the roof.
◦ Post-Frame Construction
A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
◦ Feed Room
A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
◦ Ridge Vent
A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.

Dale, Beaufort County — At a Glance

Permit Authority Name
Beaufort County Community Development Department, Building Codes / Inspections Division
Permit Authority Url
https://www.beaufortcountysc.gov/building-codes/requirements.html
Permit Threshold Sqft
200
Setback Feet Side Rear
For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
Wind Load Zone
Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
Coastal
1
Drive Miles
100.9
Drive Minutes
133
Nearby Towns
Fairview, Lobeco, Chisolm, Coosaw
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

A horse barn involves more planning than choosing a roof and four walls. You have to think about the animals, the people caring for them and how the building will be used every day. Benton Metal Depot supplies metal panels, trim and related building materials for agricultural projects, allowing customers to coordinate those exterior materials with the rest of their barn plans.

Ready to talk through your horse barns project in Dale?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://www.beaufortcountysc.gov/building-codes/index.html (2026)
  4. https://www.beaufortcountysc.gov/building-codes/requirements.html (2026)
  5. https://www.beaufortcountysc.gov/code-enforcement/faq.html ("Accessory structures 200 square feet and larger require a Building Permit... including pre-built structures"; a Zoning Permit is also required before placing any accessory structure) (2026)
  6. https://www.beaufortcountysc.gov/code-enforcement/faq.html — cross-reference against primary Beaufort County Land Development Code, Art. 4 Div. 4.2 "Accessory Uses and Structures" at https://library.municode.com/sc/beaufort_county (2026)
  7. Aggregated from windload.solutions/south-carolina-wind-load-requirements and scbaldwin.com/blog/coastal-building-codes-wind-salt-air-sc — no Beaufort County-specific primary wind-speed map/ordinance page was located; needs verification (2026)
  8. Given/client spec — Beaufort County is a coastal South Carolina county (Atlantic coastline, Sea Islands) (2026)
  9. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  10. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  11. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  12. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.