Reviewed by the Benton Metal Depot team · Updated
Do you have one horse, or several of them? It's important that the barn is suitable for both the animals and the people caring for them. Benton Metal Depot serves customers in Riverland and throughout Charleston with agricultural metal building materials, including 29-gauge and 26-gauge Rib panels panels for applicable barn packages.
Key Points
- ◦In Riverland, a permit from Charleston County Building Inspection Services is required once the barn exceeds 120 square feet.
- ◦Ventilation, drainage and access to fresh water should be considered during barn planning.
- ◦Aisle width should allow horses and handlers to move comfortably and safely.
- ◦Current lead time for horse barn materials to Riverland is 1 to 2 weeks.
- ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
At a Glance
| Permit threshold |
120
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.
As of 2026 · Source |
| Wind load zone |
Charleston County is a Coastal High-Hazard Area — secondary sources cite design wind speeds in roughly the 130-150 mph range (ASCE 7-16/7-22, Risk Category II), with the wind-borne debris region extending about 1 mile inland from the coast. Exact figure depends on precise parcel location and adopted county wind map; must be confirmed with a SC-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels
As of 2026 · Source |
| Drive time from Statesboro |
198
As of 2026 · Source |
Permits & Setbacks in Charleston County
Check the building rules before you settle on a location for the barn. Horse barn permit requirements in Riverland are handled by Charleston County Building Inspection Services. The current threshold is 120 square feet, but building size may not be the only consideration. Zoning, setbacks and how the property will be used can also affect the project. Confirm those details before preparing the site or beginning permanent construction work.
Delivery to Riverland
Don't wait until the barn materials are ready to start thinking about the site. Customers in Riverland are currently looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is about 155.7 miles away. Use that time to coordinate contractors and prepare the area where materials will be received.
Representative product photo — a Charleston County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
Do I need a permit for a horse barn in Riverland?
The requirements for Riverland are handled by Charleston County Building Inspection Services. Currently, a permit is required once the barn exceeds 120 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.
How many colors are available for a horse barn?
Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.
How wide should the aisle in a horse barn be?
The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.
Can I store hay and feed inside my horse barn?
You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.
Can I add a tack room and wash area to my horse barn?
Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.
Is a metal horse barn too hot for Georgia summers?
A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Riverland, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.
How close can I build a horse barn to my property line?
The current setback in Riverland is Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts., subject to the requirements of Charleston County Building Inspection Services and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.
What size should horse stalls be?
Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.
Definitions
- ◦ Tack Room
- A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
- ◦ Panel Gauge
- A measurement related to sheet-metal thickness.
- ◦ Stall Partition
- A wall or divider separating one horse stall from another or from an adjacent area.
- ◦ Lead Time
- The period needed to process and prepare the building materials after the relevant order stage.
- ◦ Feed Room
- A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
- ◦ Post-Frame Construction
- A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
- ◦ Setback
- The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
- ◦ Eave Height
- The height of the barn's exterior wall where it meets the lower edge of the roof.
- ◦ Roof Pitch
- The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
- ◦ Ridge Vent
- A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
Riverland, Charleston County — At a Glance
- Permit Authority Name
- Charleston County Building Inspection Services
- Permit Authority Url
- https://www.charlestoncounty.org/departments/building-inspection-services/
- Permit Threshold Sqft
- 120
- Setback Feet Side Rear
- Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.
- Wind Load Zone
- Charleston County is a Coastal High-Hazard Area — secondary sources cite design wind speeds in roughly the 130-150 mph range (ASCE 7-16/7-22, Risk Category II), with the wind-borne debris region extending about 1 mile inland from the coast. Exact figure depends on precise parcel location and adopted county wind map; must be confirmed with a SC-licensed engineer or the county building official.
- Coastal
- 1
- Drive Miles
- 155.7
- Drive Minutes
- 198
- Nearby Towns
- Parrot Point, Riverland Terrace, Seaside, Oyster Point
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has manufactured metal building products in Statesboro since 2004 and supplies materials for agricultural projects throughout the region. For someone planning a horse barn in Riverland, that means working with a regional supplier familiar with metal roofing, siding and the materials used on farm buildings. The barn's design and animal-housing requirements should be worked out alongside the material specifications.
Ready to talk through your horse barns project in Riverland?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
- https://www.charlestoncounty.org/departments/building-inspection-services/ (2026)
- Charleston County Zoning and Land Development Regulations, Sec. 3.8.2(D) (https://online.encodeplus.com/regs/charlestoncounty-sc/ereader/zldr) — a Zoning Permit is not required for one detached one-story accessory structure (tool/storage shed, playhouse, or similar) if the building footprint does not exceed 120 sq ft; this exemption applies to only one such structure per lot, and it covers the zoning permit specifically — garages and structures with electrical/plumbing typically still require a building permit regardless of size. (2026)
- Charleston County Zoning and Land Development Regulations, Sec. 3.8.2(D), https://online.encodeplus.com/regs/charlestoncounty-sc/ereader/zldr — needs direct lookup of the district-specific yard table (2026)
- Aggregated from windload.solutions and similar secondary sources — no single primary Charleston County wind-speed map document was retrieved (2026)
- Given/client spec — Charleston County is a coastal South Carolina county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Charleston County
See the Charleston County hub for horse barns
