Reviewed by the Benton Metal Depot team · Updated
Are you repairing equipment, working on vehicles or simply need a place for hobbies and projects? A metal shop building gives you a workspace that's separate from the house. Benton Metal Depot supplies workshop packages to residents in Burnt Fort and surrounding communities, with 7 colors available and a lead time of 1 to 2 weeks.
Key Points
- ◦In Burnt Fort, a permit from Camden County Office of Planning & Development is required once the workshop exceeds Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development. square feet.
- ◦Door size and placement should account for the largest equipment you expect to move into the shop.
- ◦Decide on the final building dimensions before completing permanent site work.
- ◦Current lead time for a metal shop building to Burnt Fort is 1 to 2 weeks.
- ◦The current setback for a workshop in Burnt Fort is 15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed..
At a Glance
| Permit threshold |
Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development.
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed.
As of 2026 · Source |
| Wind load zone |
Coastal Georgia (St. Marys/Kingsland) — general secondary sources place coastal GA in the ~130 mph (ASCE 7-22, Risk Category II) band, similar to Chatham/Glynn/McIntosh, but no Camden-specific primary map figure was found. Must be confirmed with a GA-licensed engineer or the county building official before publishing.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
160
As of 2026 · Source |
Permits & Setbacks in Camden County
Getting the needed permits aren't exactly the exciting part of getting a workshop, but they're much easier to handle before construction begins. The current permit threshold for a workshop in Burnt Fort is Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development. square feet, with a setback of 15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed.. Those requirements are handled by Camden County Office of Planning & Development. Local rules can change and individual properties may have additional restrictions, so confirm what applies to the project before committing to the building location or completing permanent site work.
Delivery to Burnt Fort
The workshop and the site should be ready for each other at roughly the same time. Residents in Burnt Fort are looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is approximately 135.5 miles away. Make sure any required permitting and site work are accounted for before the workshop reaches the delivery stage.
Representative product photo — a Camden County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
How long does it take to get a metal shop building?
Lead time to Burnt Fort is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.
What should I do before pouring a slab for my workshop?
Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Camden County Office of Planning & Development and coordinate the concrete dimensions with the specifications for your actual building.
How tall should my metal shop building be?
Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.
What kind of panels are used on Benton metal workshops?
Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.
What size metal shop building do I need?
Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.
How close can I build my workshop to the property line?
The current setback in Burnt Fort is 15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed., subject to the requirements of Camden County Office of Planning & Development and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.
Can I use a metal shop building for working on cars and trucks?
A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.
Can I use a metal workshop for woodworking?
Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.
Definitions
- ◦ Bay
- A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
- ◦ Roof Panel
- A formed metal sheet used as part of the exterior roofing system on the workshop.
- ◦ Building Permit
- Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
- ◦ Wall Panel
- A formed metal sheet used to enclose the exterior walls of the shop.
- ◦ Eave Height
- The height of the shop's sidewall where it meets the lower edge of the roof.
- ◦ Insulation
- Material used to reduce heat transfer through the building envelope and help control interior conditions.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Walk Door
- A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
- ◦ Clear Span
- Open interior space between the building's exterior supports without columns interrupting the work area.
Burnt Fort, Camden County — At a Glance
- Permit Authority Name
- Camden County Office of Planning & Development
- Permit Authority Url
- https://www.camdencountyga.gov/102/Permits
- Permit Threshold Sqft
- Not found — Camden County's Unified Development Code confirms accessory structure permits exist and are processed online, but no explicit sqft exemption threshold was located. Needs direct confirmation with Planning & Development.
- Setback Feet Side Rear
- 15 ft minimum side yard setback for accessory buildings per UDC Sec. 222(c)(5) (a variance may be requested to reduce it); rear-yard figure and other-district figures not independently confirmed.
- Wind Load Zone
- Coastal Georgia (St. Marys/Kingsland) — general secondary sources place coastal GA in the ~130 mph (ASCE 7-22, Risk Category II) band, similar to Chatham/Glynn/McIntosh, but no Camden-specific primary map figure was found. Must be confirmed with a GA-licensed engineer or the county building official before publishing.
- Coastal
- 1
- Drive Miles
- 135.5
- Drive Minutes
- 160
- Nearby Towns
- Tarboro, Big Oak, Midriver, White Oak
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot manufactures metal building products in Statesboro and has served the region since 2004. The company works with residential, agricultural and commercial projects and uses a single-source coil supplier to maintain consistency in its metal products. Customers in Burnt Fort can request a workshop quote based on the size and specifications of their project.
Ready to talk through your workshops project in Burnt Fort?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://www.camdencountyga.gov/102/Permits (2026)
- https://www.co.camden.ga.us/ArchiveCenter/ViewFile/Item/644 (Unified Development Code) and https://www.camdencountyga.gov/1250/Permit-Fee-Schedule (2026)
- Camden County Unified Development Code, Sec. 222(c)(5) — verify against the primary UDC document at https://www.co.camden.ga.us/ArchiveCenter/ViewFile/Item/644 (2026)
- Aggregated from windload.solutions and similar secondary sources — no Camden-specific primary map found (2026)
- Given/client spec — Camden County (St. Marys/Kingsland) is a coastal Georgia county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Camden County
See the Camden County hub for workshops
