If your tools and equipment have outgrown the garage, a separate workshop may be what you need. Benton Metal Depot supplies metal shop buildings throughout Candler using 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. Residents in Olifftown can plan the space around workbenches, equipment, storage and the doors needed to move everything in and out.

Key Points

  • ◦Decide on the final building dimensions before completing permanent site work.
  • ◦Current lead time for a metal shop building to Olifftown is 1 to 2 weeks.
  • ◦In Olifftown, a permit from Candler County Zoning Administrator (building permit applications go through this office; a separate Assessor's Office handles mobile home/electrical permits) is required once the workshop exceeds 100 square feet.
  • ◦Door size and placement should account for the largest equipment you expect to move into the shop.
  • ◦Benton Metal Depot is approximately 19.5 miles from Olifftown.

At a Glance

Permit threshold 100
As of 2026 · Source
Setback (side/rear) Referenced but not confirmed — the county page cites "Section 802.5" of the Candler County Zoning Ordinance for setbacks, but the specific distances could not be extracted from the ordinance PDF in this research pass. Needs direct confirmation with the Zoning Administrator (912-685-2835).
As of 2026 · Source
Wind load zone Inland Georgia — roughly 110-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7 edition Candler County has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 34
As of 2026 · Source

Permits & Setbacks in Candler County

A workshop may fit on the property without fitting the local building rules. If you're planning a shop in Olifftown, start by checking with Candler County Zoning Administrator (building permit applications go through this office; a separate Assessor's Office handles mobile home/electrical permits). The permit requirement applies once the building exceeds 100 square feet, and the current setback is Referenced but not confirmed — the county page cites "Section 802.5" of the Candler County Zoning Ordinance for setbacks, but the specific distances could not be extracted from the ordinance PDF in this research pass. Needs direct confirmation with the Zoning Administrator (912-685-2835).. Getting those answers early gives you a better idea of how much of the property is actually available for the building before site preparation starts.

Delivery to Olifftown

The workshop and the site should be ready for each other at roughly the same time. Residents in Olifftown are looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is approximately 19.5 miles away. Make sure any required permitting and site work are accounted for before the workshop reaches the delivery stage.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Candler County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

How long does it take to get a metal shop building?

Lead time to Olifftown is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.

What should I do before pouring a slab for my workshop?

Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Candler County Zoning Administrator (building permit applications go through this office; a separate Assessor's Office handles mobile home/electrical permits) and coordinate the concrete dimensions with the specifications for your actual building.

How tall should my metal shop building be?

Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.

What size metal shop building do I need?

Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.

What kind of panels are used on Benton metal workshops?

Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.

How close can I build my workshop to the property line?

The current setback in Olifftown is Referenced but not confirmed — the county page cites "Section 802.5" of the Candler County Zoning Ordinance for setbacks, but the specific distances could not be extracted from the ordinance PDF in this research pass. Needs direct confirmation with the Zoning Administrator (912-685-2835)., subject to the requirements of Candler County Zoning Administrator (building permit applications go through this office; a separate Assessor's Office handles mobile home/electrical permits) and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.

Can I use a metal shop building for working on cars and trucks?

A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

Definitions

◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Building Permit
Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
◦ Overhead Door
A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
◦ Insulation
Material used to reduce heat transfer through the building envelope and help control interior conditions.
◦ Roof Pitch
The slope of the roof, expressed by how much it rises over a given horizontal distance.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
◦ Bay
A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
◦ Roof Panel
A formed metal sheet used as part of the exterior roofing system on the workshop.

Olifftown, Candler County — At a Glance

Permit Authority Name
Candler County Zoning Administrator (building permit applications go through this office; a separate Assessor's Office handles mobile home/electrical permits)
Permit Authority Url
https://candlerco-ga.gov/1228/Building-Permits
Permit Threshold Sqft
100
Setback Feet Side Rear
Referenced but not confirmed — the county page cites "Section 802.5" of the Candler County Zoning Ordinance for setbacks, but the specific distances could not be extracted from the ordinance PDF in this research pass. Needs direct confirmation with the Zoning Administrator (912-685-2835).
Wind Load Zone
Inland Georgia — roughly 110-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7 edition Candler County has adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
19.5
Drive Minutes
34
Nearby Towns
Aline, Parish, Pulaski, Metter
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal products in Statesboro since 2004 and works with homeowners, contractors and property owners throughout the region. For someone planning a workshop in Olifftown, that means the building package can be based on the actual size, panel specifications and materials the project calls for instead of trying to piece those components together separately.

Ready to talk through your workshops project in Olifftown?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://candlerco-ga.gov/1228/Building-Permits (2026)
  4. https://candlerco-ga.gov/1228/Building-Permits — "A building permit is required under the zoning ordinance...for the construction or addition of square footage greater than 10' X 10' [100 sq ft]" (Section 802.4, Candler County Zoning Ordinance). Verify against the primary ordinance PDF at https://metter-candlercounty.com/index_238_2282343757.pdf, which could not be parsed via automated fetch in this research pass. (2026)
  5. https://metter-candlercounty.com/index_238_2282343757.pdf (Candler County Zoning Ordinance, Section 802.5) (2026)
  6. General ASCE 7 inland-Georgia range (aggregated secondary sources) — no county-specific or primary map source found (2026)
  7. Candler County is inland (southeast-central GA) and is not among the coastal counties named in the client spec (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.