Workshops in Relee 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

If your tools and equipment have outgrown the garage, a separate workshop may be what you need. Benton Metal Depot supplies metal shop buildings throughout Coffee using 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. Residents in Relee can plan the space around workbenches, equipment, storage and the doors needed to move everything in and out.

Key Points

  • ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.
  • ◦Workshop customers can choose from 7 available colors.
  • ◦Benton Metal Depot is approximately 119.1 miles from Relee.
  • ◦The current setback for a workshop in Relee is Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation..
  • ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.

At a Glance

Permit threshold Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171).
As of 2026 · Source
Setback (side/rear) Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation.
As of 2026 · Source
Wind load zone Inland Georgia — roughly 110-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7 edition Coffee County has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 158
As of 2026 · Source

Permits & Setbacks in Coffee County

Before laying out the workshop on your property, make sure the spot you've chosen can really be used. Workshop permit requirements in Relee are handled by Coffee County Code Enforcement Department. The current threshold is Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171). square feet, but size isn't the only thing to check. Setbacks, zoning and other local requirements may affect the project too. Confirm those details before pouring concrete, grading the site or doing other permanent work.

Delivery to Relee

Use the delivery window to get everything else lined up before the workshop is ready. The typical lead time for a metal shop building to Relee is 1 to 2 weeks. That gives you time to handle permits and coordinate any grading, concrete or other site work. The goal is to have the property ready without scrambling when delivery gets close.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Coffee County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Can I use a metal shop building for working on cars and trucks?

A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.

How close can I build my workshop to the property line?

The current setback in Relee is Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation., subject to the requirements of Coffee County Code Enforcement Department and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.

How should I plan the doors on a metal workshop?

Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.

Should I insulate my metal workshop?

That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

How many workshop colors can I choose from?

There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.

Do I need a permit for a workshop in Relee?

The requirements in Relee are handled by Coffee County Code Enforcement Department. Currently, a permit is required once the building exceeds Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171). square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.

Definitions

◦ Building Permit
Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
◦ Roof Panel
A formed metal sheet used as part of the exterior roofing system on the workshop.
◦ Bay
A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
◦ Insulation
Material used to reduce heat transfer through the building envelope and help control interior conditions.
◦ Eave Height
The height of the shop's sidewall where it meets the lower edge of the roof.
◦ Wall Panel
A formed metal sheet used to enclose the exterior walls of the shop.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Setback
The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.

Relee, Coffee County — At a Glance

Permit Authority Name
Coffee County Code Enforcement Department
Permit Authority Url
https://www.coffeecounty-ga.gov/departments/code_enforcement/index.php
Permit Threshold Sqft
Not explicitly published — Code Enforcement confirms it writes permits for "new construction...swimming pool, utility shed" among other categories, implying sheds do require permits, but no specific sqft exemption threshold was found online. Needs direct confirmation (912-393-7170/7171).
Setback Feet Side Rear
Not confirmed — Coffee County's zoning districts and dimensional standards are published via Municode (Appendix D, Chapter 3 – Zoning Districts) but specific setback figures were not extractable via search. Needs direct confirmation.
Wind Load Zone
Inland Georgia — roughly 110-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7 edition Coffee County has adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
119.1
Drive Minutes
158
Nearby Towns
Lotts, Sapps Still, Pridgen, Broxton
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.

Ready to talk through your workshops project in Relee?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://www.coffeecounty-ga.gov/departments/code_enforcement/index.php (2026)
  4. https://library.municode.com/ga/coffee_county/codes/code_of_ordinances?nodeId=PTIICOOR_APXDLADECO_CH3ZODI (2026)
  5. General ASCE 7 inland-Georgia range (aggregated secondary sources) — no county-specific or primary map source found (2026)
  6. Coffee County is inland (south-central GA) and is not among the coastal counties named in the client spec (2026)
  7. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  8. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  9. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  10. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.