Workshops in Camp Rawls 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

If your tools and equipment have outgrown the garage, a separate workshop may be what you need. Benton Metal Depot supplies metal shop buildings throughout Aiken using 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. Residents in Camp Rawls can plan the space around workbenches, equipment, storage and the doors needed to move everything in and out.

Key Points

  • ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
  • ◦The current setback for a workshop in Camp Rawls is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number..
  • ◦Benton Metal Depot is approximately 114.8 miles from Camp Rawls.
  • ◦Workshop customers can choose from 7 available colors.
  • ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
As of 2026 · Source
Wind load zone Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 151
As of 2026 · Source

Permits & Setbacks in Aiken County

Getting the needed permits aren't exactly the exciting part of getting a workshop, but they're much easier to handle before construction begins. The current permit threshold for a workshop in Camp Rawls is 200 square feet, with a setback of Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.. Those requirements are handled by Aiken County Planning and Development Department (Building Codes/Inspections Division). Local rules can change and individual properties may have additional restrictions, so confirm what applies to the project before committing to the building location or completing permanent site work.

Delivery to Camp Rawls

Use the delivery window to get everything else lined up before the workshop is ready. The typical lead time for a metal shop building to Camp Rawls is 1 to 2 weeks. That gives you time to handle permits and coordinate any grading, concrete or other site work. The goal is to have the property ready without scrambling when delivery gets close.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Aiken County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Should I insulate my metal workshop?

That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.

How should I plan the doors on a metal workshop?

Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.

How long does it take to get a metal shop building?

Lead time to Camp Rawls is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.

What kind of panels are used on Benton metal workshops?

Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.

What size metal shop building do I need?

Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

How close can I build my workshop to the property line?

The current setback in Camp Rawls is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number., subject to the requirements of Aiken County Planning and Development Department (Building Codes/Inspections Division) and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.

Definitions

◦ Building Permit
Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
◦ Overhead Door
A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
◦ Roof Pitch
The slope of the roof, expressed by how much it rises over a given horizontal distance.
◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Insulation
Material used to reduce heat transfer through the building envelope and help control interior conditions.
◦ Wall Panel
A formed metal sheet used to enclose the exterior walls of the shop.
◦ Eave Height
The height of the shop's sidewall where it meets the lower edge of the roof.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.

Camp Rawls, Aiken County — At a Glance

Permit Authority Name
Aiken County Planning and Development Department (Building Codes/Inspections Division)
Permit Authority Url
https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf
Permit Threshold Sqft
200
Setback Feet Side Rear
Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
Wind Load Zone
Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
Coastal
Drive Miles
114.8
Drive Minutes
151
Nearby Towns
Seivern, Wagener, Kitchings Mill, Berlin
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.

Ready to talk through your workshops project in Camp Rawls?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf (2026)
  4. Aiken County Planning & Development FAQ ("If the structure is over 200 square feet, then a building permit is required. If the structure is under 200 square feet, no permit is required.") — https://www.aikencountysc.gov/Faq.aspx?TID=24 — consistent with SC Residential Code § R105.2 statewide default (2026)
  5. https://library.municode.com/sc/aiken_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH24LAMARE_ARTVIIIGEANRE (2026)
  6. General ASCE 7 inland-SC range (aggregated secondary sources) — no county-specific or primary map source found (2026)
  7. Aiken County is deep inland (western SC, on the GA border near Augusta) and is not among the coastal counties named in the client spec (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.