Do you need a dedicated place where you can work in Maryville? A workshop gives you room for tools, equipment, storage and projects so you don't take over the garage. Benton Metal Depot supplies metal shop buildings throughout Charleston, with buildings that can be customized to the type of work you actually expect to do inside.

Key Points

  • ◦Decide on the final building dimensions before completing permanent site work.
  • ◦Current lead time for a metal shop building to Maryville is 1 to 2 weeks.
  • ◦In Maryville, a permit from Charleston County Building Inspection Services is required once the workshop exceeds 120 square feet.
  • ◦Door size and placement should account for the largest equipment you expect to move into the shop.
  • ◦Benton Metal Depot is approximately 149.2 miles from Maryville.

At a Glance

Permit threshold 120
As of 2026 · Source
Setback (side/rear) Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.
As of 2026 · Source
Wind load zone Charleston County is a Coastal High-Hazard Area — secondary sources cite design wind speeds in roughly the 130-150 mph range (ASCE 7-16/7-22, Risk Category II), with the wind-borne debris region extending about 1 mile inland from the coast. Exact figure depends on precise parcel location and adopted county wind map; must be confirmed with a SC-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 184
As of 2026 · Source

Permits & Setbacks in Charleston County

Getting the needed permits aren't exactly the exciting part of getting a workshop, but they're much easier to handle before construction begins. The current permit threshold for a workshop in Maryville is 120 square feet, with a setback of Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.. Those requirements are handled by Charleston County Building Inspection Services. Local rules can change and individual properties may have additional restrictions, so confirm what applies to the project before committing to the building location or completing permanent site work.

Delivery to Maryville

The workshop and the site should be ready for each other at roughly the same time. Residents in Maryville are looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is approximately 149.2 miles away. Make sure any required permitting and site work are accounted for before the workshop reaches the delivery stage.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Charleston County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

How close can I build my workshop to the property line?

The current setback in Maryville is Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts., subject to the requirements of Charleston County Building Inspection Services and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.

Can I use a metal shop building for working on cars and trucks?

A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.

Do I need a permit for a workshop in Maryville?

The requirements in Maryville are handled by Charleston County Building Inspection Services. Currently, a permit is required once the building exceeds 120 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.

How many workshop colors can I choose from?

There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.

Should I insulate my metal workshop?

That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.

How should I plan the doors on a metal workshop?

Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.

Definitions

◦ Roof Panel
A formed metal sheet used as part of the exterior roofing system on the workshop.
◦ Bay
A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
◦ Ventilation
The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
◦ Concrete Slab
A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
◦ Setback
The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
◦ Eave Height
The height of the shop's sidewall where it meets the lower edge of the roof.
◦ Wall Panel
A formed metal sheet used to enclose the exterior walls of the shop.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.

Maryville, Charleston County — At a Glance

Permit Authority Name
Charleston County Building Inspection Services
Permit Authority Url
https://www.charlestoncounty.org/departments/building-inspection-services/
Permit Threshold Sqft
120
Setback Feet Side Rear
Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.
Wind Load Zone
Charleston County is a Coastal High-Hazard Area — secondary sources cite design wind speeds in roughly the 130-150 mph range (ASCE 7-16/7-22, Risk Category II), with the wind-borne debris region extending about 1 mile inland from the coast. Exact figure depends on precise parcel location and adopted county wind map; must be confirmed with a SC-licensed engineer or the county building official.
Coastal
1
Drive Miles
149.2
Drive Minutes
184
Nearby Towns
Edgewater Park, Pinecrest, Avondale, Dupont Station
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.

Ready to talk through your workshops project in Maryville?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://www.charlestoncounty.org/departments/building-inspection-services/ (2026)
  4. Charleston County Zoning and Land Development Regulations, Sec. 3.8.2(D) (https://online.encodeplus.com/regs/charlestoncounty-sc/ereader/zldr) — a Zoning Permit is not required for one detached one-story accessory structure (tool/storage shed, playhouse, or similar) if the building footprint does not exceed 120 sq ft; this exemption applies to only one such structure per lot, and it covers the zoning permit specifically — garages and structures with electrical/plumbing typically still require a building permit regardless of size. (2026)
  5. Charleston County Zoning and Land Development Regulations, Sec. 3.8.2(D), https://online.encodeplus.com/regs/charlestoncounty-sc/ereader/zldr — needs direct lookup of the district-specific yard table (2026)
  6. Aggregated from windload.solutions and similar secondary sources — no single primary Charleston County wind-speed map document was retrieved (2026)
  7. Given/client spec — Charleston County is a coastal South Carolina county (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.