Reviewed by the Benton Metal Depot team · Updated
Are you repairing equipment, working on vehicles or simply need a place for hobbies and projects? A metal shop building gives you a workspace that's separate from the house. Benton Metal Depot supplies workshop packages to residents in Switzerland and surrounding communities, with 7 colors available and a lead time of 1 to 2 weeks.
Key Points
- ◦Current lead time for a metal shop building to Switzerland is 1 to 2 weeks.
- ◦Door size and placement should account for the largest equipment you expect to move into the shop.
- ◦Decide on the final building dimensions before completing permanent site work.
- ◦In Switzerland, a permit from Jasper County Planning and Building Services Department is required once the workshop exceeds 200 square feet.
- ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
As of 2026 · Source |
| Wind load zone |
Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
93
As of 2026 · Source |
Permits & Setbacks in Jasper County
Before laying out the workshop on your property, make sure the spot you've chosen can really be used. Workshop permit requirements in Switzerland are handled by Jasper County Planning and Building Services Department. The current threshold is 200 square feet, but size isn't the only thing to check. Setbacks, zoning and other local requirements may affect the project too. Confirm those details before pouring concrete, grading the site or doing other permanent work.
Delivery to Switzerland
Once the workshop is ordered, the lead time becomes your project calendar. Current delivery to Switzerland is estimated at 1 to 2 weeks. Benton also serves nearby communities including Grahamville, Mitchellville, Bashan and Jasper. Use that time to finish local requirements and prepare the site for the building.
Representative product photo — a Jasper County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
How should I plan the doors on a metal workshop?
Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.
Should I insulate my metal workshop?
That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.
What kind of panels are used on Benton metal workshops?
Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.
What size metal shop building do I need?
Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.
Can I use a metal workshop for woodworking?
Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.
Can I store equipment in my workshop too?
Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.
How long does it take to get a metal shop building?
Lead time to Switzerland is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.
Do I need a permit for a workshop in Switzerland?
The requirements in Switzerland are handled by Jasper County Planning and Building Services Department. Currently, a permit is required once the building exceeds 200 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.
Definitions
- ◦ Roof Pitch
- The slope of the roof, expressed by how much it rises over a given horizontal distance.
- ◦ Overhead Door
- A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
- ◦ Building Permit
- Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
- ◦ Insulation
- Material used to reduce heat transfer through the building envelope and help control interior conditions.
- ◦ Panel Gauge
- A measurement associated with the thickness of sheet metal.
- ◦ Clear Span
- Open interior space between the building's exterior supports without columns interrupting the work area.
- ◦ Walk Door
- A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
- ◦ Eave Height
- The height of the shop's sidewall where it meets the lower edge of the roof.
Switzerland, Jasper County — At a Glance
- Permit Authority Name
- Jasper County Planning and Building Services Department
- Permit Authority Url
- https://www.jaspercountysc.gov/services/planning-and-building/
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
- Wind Load Zone
- Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
- Coastal
- 1
- Drive Miles
- 79
- Drive Minutes
- 93
- Nearby Towns
- Grahamville, Mitchellville, Bashan, Jasper
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has manufactured metal products in Statesboro since 2004 and works with homeowners, contractors and property owners throughout the region. For someone planning a workshop in Switzerland, that means the building package can be based on the actual size, panel specifications and materials the project calls for instead of trying to piece those components together separately.
Ready to talk through your workshops project in Switzerland?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ (2026)
- Jasper County Code § 20.90.060 (Improvement Location Permit), as cited by https://jasper.county.codes/JCC/20.90.060 and summarized by secondary sources: "residential accessory structures less than 200 square feet, commercial accessory structures less than 120 square feet" are exempt from a building permit (zoning/setback compliance still required). Verify against the primary code text directly. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ordinances-regulations/ (2026)
- Aggregated from windload.solutions (South Carolina Wind Load Requirements) and general ASCE 7-16 coastal SC guidance — no Jasper County-specific primary map source found (2026)
- Given/client spec — Jasper County, SC is a coastal county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Jasper County
See the Jasper County hub for workshops
