Do you have one horse, or several of them? It's important that the barn is suitable for both the animals and the people caring for them. Benton Metal Depot serves customers in National Hills and throughout Richmond with agricultural metal building materials, including 29-gauge and 26-gauge Rib panels panels for applicable barn packages.

Key Points

  • ◦In National Hills, a permit from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division is required once the barn exceeds 120 square feet.
  • ◦Current lead time for horse barn materials to National Hills is 1 to 2 weeks.
  • ◦Benton Metal Depot is approximately 80.3 miles from National Hills.
  • ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
  • ◦The current local setback for a horse barn in National Hills is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)..

At a Glance

Permit threshold 120
As of 2026 · Source
Setback (side/rear) Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source
Wind load zone Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 107
As of 2026 · Source

Permits & Setbacks in Richmond County

Just because a property can fit a barn doesn't necessarily mean you can put it anywhere. For a horse barn in National Hills, a permit from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division is required once the building exceeds 120 square feet, and the current setback is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. Check with that office before choosing the final location, especially if the barn will be near a property boundary, neighboring home or another building.

Delivery to National Hills

Don't wait until the barn materials are ready to start thinking about the site. Customers in National Hills are currently looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is about 80.3 miles away. Use that time to coordinate contractors and prepare the area where materials will be received.

Metal horse barn by Benton Metal Depot

Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

What kind of floor is best for a horse barn?

Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.

How long does it take to get horse barn materials delivered?

Current delivery to National Hills is estimated at 1 to 2 weeks. Use that window to work through permits, contractor schedules and site preparation. Confirm the estimate for your specific order when placing it and planning the overall construction schedule.

What kind of metal panels does Benton use for horse barns?

The applicable horse barn package uses 29-gauge and 26-gauge Rib panels panels. Metal roofing and siding help enclose the building and protect it from the weather, but panel selection is only part of planning a barn. Ventilation, condensation control and the safety of surfaces horses can reach should also be addressed in the finished design.

How big should a horse barn be?

Start with the number and size of your horses, then add the space needed for safe handling and daily care. Stalls are only one part of the layout. You'll also need room for aisles, doors, feed, tack and possibly a wash area. If you expect to add horses later, think about that before choosing the building dimensions.

Should a horse barn have insulation?

That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.

What size should horse stalls be?

Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.

How close can I build a horse barn to my property line?

The current setback in National Hills is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)., subject to the requirements of Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.

Can I store hay and feed inside my horse barn?

You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.

Definitions

◦ Center Aisle
A passageway running through the barn, usually with stalls or other rooms along one or both sides.
◦ Dutch Door
A door divided into upper and lower sections that can open separately. Some horse barns use them for stall or exterior access.
◦ Ridge Vent
A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
◦ Condensation
Moisture that forms when humid air contacts a sufficiently cool surface. Poorly managed condensation can cause damp conditions inside a barn.
◦ Wash Stall
An area designed for washing or grooming horses, with suitable water access, drainage and slip-resistant footing.
◦ Horse Stall
An individual enclosed space inside a barn where a horse can rest, eat and be housed.
◦ Panel Gauge
A measurement related to sheet-metal thickness.
◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.
◦ Stall Partition
A wall or divider separating one horse stall from another or from an adjacent area.
◦ Tack Room
A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.

National Hills, Richmond County — At a Glance

Permit Authority Name
Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
Permit Authority Url
https://www.augustaga.gov/2101/Building-Permits
Permit Threshold Sqft
120
Setback Feet Side Rear
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
Wind Load Zone
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
80.3
Drive Minutes
107
Nearby Towns
Wheless, Augusta, Belair, Murray Hills
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has served contractors and property owners from Statesboro since 2004. The company manufactures metal roofing products and uses a single-source coil supplier to help maintain color consistency. For customers building a horse barn in National Hills, Benton can supply applicable metal roofing and siding materials based on the project's specifications and selected finishes.

Ready to talk through your horse barns project in National Hills?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://www.augustaga.gov/2099/Building-Construction (2026)
  4. https://www.augustaga.gov/2101/Building-Permits (2026)
  5. Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
  6. Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
  7. https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
  8. Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
  9. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  10. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  11. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  12. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.