Horse Barns in Wheless 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

If you're building a horse barn in Wheless, don't plan around stalls alone. You'll also need to think about airflow, water access, feed, tack and where the horses will enter and leave. Benton Metal Depot supplies metal building materials throughout Richmond, with 7 exterior colors available for applicable packages.

Key Points

  • ◦In Wheless, a permit from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division is required once the barn exceeds 120 square feet.
  • ◦Current lead time for horse barn materials to Wheless is 1 to 2 weeks.
  • ◦Benton Metal Depot is approximately 80.3 miles from Wheless.
  • ◦The current local setback for a horse barn in Wheless is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)..
  • ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.

At a Glance

Permit threshold 120
As of 2026 · Source
Setback (side/rear) Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source
Wind load zone Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 107
As of 2026 · Source

Permits & Setbacks in Richmond County

Barn placement is something to figure out before the ground is cleared. If you're planning a horse barn in Wheless, contact Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division about the local requirements. The permit rule applies once the building exceeds 120 square feet, and the current setback is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. You should also check whether any additional rules apply to keeping horses on the property before committing to a building location.

Delivery to Wheless

Don't wait until the barn materials are ready to start thinking about the site. Customers in Wheless are currently looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is about 80.3 miles away. Use that time to coordinate contractors and prepare the area where materials will be received.

Metal horse barn by Benton Metal Depot

Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

What size should horse stalls be?

Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.

Should a horse barn have insulation?

That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.

How close can I build a horse barn to my property line?

The current setback in Wheless is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)., subject to the requirements of Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.

How many colors are available for a horse barn?

Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.

Do I need a permit for a horse barn in Wheless?

The requirements for Wheless are handled by Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Currently, a permit is required once the barn exceeds 120 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.

What kind of floor is best for a horse barn?

Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.

Is a metal horse barn too hot for Georgia summers?

A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Wheless, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.

Can I add a tack room and wash area to my horse barn?

Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.

Definitions

◦ Stall Partition
A wall or divider separating one horse stall from another or from an adjacent area.
◦ Tack Room
A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
◦ Ridge Vent
A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
◦ Condensation
Moisture that forms when humid air contacts a sufficiently cool surface. Poorly managed condensation can cause damp conditions inside a barn.
◦ Eave Height
The height of the barn's exterior wall where it meets the lower edge of the roof.
◦ Feed Room
A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
◦ Post-Frame Construction
A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
◦ Center Aisle
A passageway running through the barn, usually with stalls or other rooms along one or both sides.
◦ Dutch Door
A door divided into upper and lower sections that can open separately. Some horse barns use them for stall or exterior access.
◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.

Wheless, Richmond County — At a Glance

Permit Authority Name
Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
Permit Authority Url
https://www.augustaga.gov/2101/Building-Permits
Permit Threshold Sqft
120
Setback Feet Side Rear
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
Wind Load Zone
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
80.3
Drive Minutes
107
Nearby Towns
National Hills, Augusta, Belair, Murray Hills
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

A horse barn involves more planning than choosing a roof and four walls. You have to think about the animals, the people caring for them and how the building will be used every day. Benton Metal Depot supplies metal panels, trim and related building materials for agricultural projects, allowing customers to coordinate those exterior materials with the rest of their barn plans.

Ready to talk through your horse barns project in Wheless?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://www.augustaga.gov/2099/Building-Construction (2026)
  4. https://www.augustaga.gov/2101/Building-Permits (2026)
  5. Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
  6. Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
  7. https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
  8. Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
  9. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  10. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  11. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  12. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.