Horse Barns in Croft 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

Do you have one horse, or several of them? It's important that the barn is suitable for both the animals and the people caring for them. Benton Metal Depot serves customers in Croft and throughout Aiken with agricultural metal building materials, including 29-gauge and 26-gauge Rib panels panels for applicable barn packages.

Key Points

  • ◦In Croft, a permit from Aiken County Planning and Development Department (Building Codes/Inspections Division) is required once the barn exceeds 200 square feet.
  • ◦Benton Metal Depot is approximately 109.7 miles from Croft.
  • ◦Current lead time for horse barn materials to Croft is 1 to 2 weeks.
  • ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
  • ◦The current local setback for a horse barn in Croft is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number..

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
As of 2026 · Source
Wind load zone Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 139
As of 2026 · Source

Permits & Setbacks in Aiken County

Barn placement is something to figure out before the ground is cleared. If you're planning a horse barn in Croft, contact Aiken County Planning and Development Department (Building Codes/Inspections Division) about the local requirements. The permit rule applies once the building exceeds 200 square feet, and the current setback is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.. You should also check whether any additional rules apply to keeping horses on the property before committing to a building location.

Delivery to Croft

A little planning ahead can make barn delivery much easier, especially on a working property. Horse barn material delivery to Croft currently takes approximately 1 to 2 weeks. Benton Metal Depot is approximately 109.7 miles away. Make sure delivery vehicles can reach the unloading area and that any necessary site work is handled before the materials are scheduled to arrive.

Metal horse barn by Benton Metal Depot

Representative product photo — a Aiken County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Do I need a permit for a horse barn in Croft?

The requirements for Croft are handled by Aiken County Planning and Development Department (Building Codes/Inspections Division). Currently, a permit is required once the barn exceeds 200 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.

How many colors are available for a horse barn?

Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.

Can I store hay and feed inside my horse barn?

You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.

How wide should the aisle in a horse barn be?

The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.

Is a metal horse barn too hot for Georgia summers?

A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Croft, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.

Can I add a tack room and wash area to my horse barn?

Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.

How close can I build a horse barn to my property line?

The current setback in Croft is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number., subject to the requirements of Aiken County Planning and Development Department (Building Codes/Inspections Division) and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.

What size should horse stalls be?

Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.

Definitions

◦ Wash Stall
An area designed for washing or grooming horses, with suitable water access, drainage and slip-resistant footing.
◦ Horse Stall
An individual enclosed space inside a barn where a horse can rest, eat and be housed.
◦ Ridge Vent
A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
◦ Condensation
Moisture that forms when humid air contacts a sufficiently cool surface. Poorly managed condensation can cause damp conditions inside a barn.
◦ Center Aisle
A passageway running through the barn, usually with stalls or other rooms along one or both sides.
◦ Dutch Door
A door divided into upper and lower sections that can open separately. Some horse barns use them for stall or exterior access.
◦ Feed Room
A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
◦ Post-Frame Construction
A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
◦ Eave Height
The height of the barn's exterior wall where it meets the lower edge of the roof.
◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.

Croft, Aiken County — At a Glance

Permit Authority Name
Aiken County Planning and Development Department (Building Codes/Inspections Division)
Permit Authority Url
https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf
Permit Threshold Sqft
200
Setback Feet Side Rear
Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
Wind Load Zone
Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
Coastal
Drive Miles
109.7
Drive Minutes
139
Nearby Towns
Seiglers Crossroads, Camp Long, Camp Gravatt, Foxtown
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has served contractors and property owners from Statesboro since 2004. The company manufactures metal roofing products and uses a single-source coil supplier to help maintain color consistency. For customers building a horse barn in Croft, Benton can supply applicable metal roofing and siding materials based on the project's specifications and selected finishes.

Ready to talk through your horse barns project in Croft?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf (2026)
  4. Aiken County Planning & Development FAQ ("If the structure is over 200 square feet, then a building permit is required. If the structure is under 200 square feet, no permit is required.") — https://www.aikencountysc.gov/Faq.aspx?TID=24 — consistent with SC Residential Code § R105.2 statewide default (2026)
  5. https://library.municode.com/sc/aiken_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH24LAMARE_ARTVIIIGEANRE (2026)
  6. General ASCE 7 inland-SC range (aggregated secondary sources) — no county-specific or primary map source found (2026)
  7. Aiken County is deep inland (western SC, on the GA border near Augusta) and is not among the coastal counties named in the client spec (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.