A good horse barn gives you shelter, storage and enough room to handle everyday chores without everything feeling crowded. Benton Metal Depot supplies agricultural building materials for properties in New Holland Crossroads and nearby communities, with a lead time of 1 to 2 weeks. Knowing this gives you a starting point for planning the rest of the project.
Key Points
- ◦Current lead time for horse barn materials to New Holland Crossroads is 1 to 2 weeks.
- ◦In New Holland Crossroads, a permit from Aiken County Planning and Development Department (Building Codes/Inspections Division) is required once the barn exceeds 200 square feet.
- ◦Benton Metal Depot is approximately 128.7 miles from New Holland Crossroads.
- ◦Aisle width should allow horses and handlers to move comfortably and safely.
- ◦Plan stall dimensions around the horses that will actually use them.
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
As of 2026 · Source |
| Wind load zone |
Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels
As of 2026 · Source |
| Drive time from Statesboro |
165
As of 2026 · Source |
Permits & Setbacks in Aiken County
Just because a property can fit a barn doesn't necessarily mean you can put it anywhere. For a horse barn in New Holland Crossroads, a permit from Aiken County Planning and Development Department (Building Codes/Inspections Division) is required once the building exceeds 200 square feet, and the current setback is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.. Check with that office before choosing the final location, especially if the barn will be near a property boundary, neighboring home or another building.
Delivery to New Holland Crossroads
Once you know what barn you need, the next step is getting the property ready for it. The typical lead time for a horse barn package to New Holland Crossroads is 1 to 2 weeks. Use that window to handle permits, access and any site preparation. If you're arranging grading or concrete work, coordinate those jobs with the building specifications and expected delivery schedule.
Representative product photo — a Aiken County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
What size should horse stalls be?
Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.
How close can I build a horse barn to my property line?
The current setback in New Holland Crossroads is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number., subject to the requirements of Aiken County Planning and Development Department (Building Codes/Inspections Division) and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.
Is a metal horse barn too hot for Georgia summers?
A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In New Holland Crossroads, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.
Can I add a tack room and wash area to my horse barn?
Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.
Can I store hay and feed inside my horse barn?
You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.
How wide should the aisle in a horse barn be?
The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.
How many colors are available for a horse barn?
Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.
Do I need a permit for a horse barn in New Holland Crossroads?
The requirements for New Holland Crossroads are handled by Aiken County Planning and Development Department (Building Codes/Inspections Division). Currently, a permit is required once the barn exceeds 200 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.
Definitions
- ◦ Ridge Vent
- A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
- ◦ Horse Stall
- An individual enclosed space inside a barn where a horse can rest, eat and be housed.
- ◦ Wash Stall
- An area designed for washing or grooming horses, with suitable water access, drainage and slip-resistant footing.
- ◦ Dutch Door
- A door divided into upper and lower sections that can open separately. Some horse barns use them for stall or exterior access.
- ◦ Center Aisle
- A passageway running through the barn, usually with stalls or other rooms along one or both sides.
- ◦ Condensation
- Moisture that forms when humid air contacts a sufficiently cool surface. Poorly managed condensation can cause damp conditions inside a barn.
- ◦ Lead Time
- The period needed to process and prepare the building materials after the relevant order stage.
- ◦ Panel Gauge
- A measurement related to sheet-metal thickness.
- ◦ Eave Height
- The height of the barn's exterior wall where it meets the lower edge of the roof.
- ◦ Post-Frame Construction
- A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
New Holland Crossroads, Aiken County — At a Glance
- Permit Authority Name
- Aiken County Planning and Development Department (Building Codes/Inspections Division)
- Permit Authority Url
- https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
- Wind Load Zone
- Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 128.7
- Drive Minutes
- 165
- Nearby Towns
- Jones Crossroads, New Holland, Monetta, Seiglers Crossroads
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels
- Color Count
- 7
Why Benton Metal Depot
A horse barn involves more planning than choosing a roof and four walls. You have to think about the animals, the people caring for them and how the building will be used every day. Benton Metal Depot supplies metal panels, trim and related building materials for agricultural projects, allowing customers to coordinate those exterior materials with the rest of their barn plans.
Ready to talk through your horse barns project in New Holland Crossroads?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
- https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf (2026)
- Aiken County Planning & Development FAQ ("If the structure is over 200 square feet, then a building permit is required. If the structure is under 200 square feet, no permit is required.") — https://www.aikencountysc.gov/Faq.aspx?TID=24 — consistent with SC Residential Code § R105.2 statewide default (2026)
- https://library.municode.com/sc/aiken_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH24LAMARE_ARTVIIIGEANRE (2026)
- General ASCE 7 inland-SC range (aggregated secondary sources) — no county-specific or primary map source found (2026)
- Aiken County is deep inland (western SC, on the GA border near Augusta) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Aiken County
See the Aiken County hub for horse barns