Reviewed by the Benton Metal Depot team · Updated
Do you need a dedicated place where you can work in Montclair? A workshop gives you room for tools, equipment, storage and projects so you don't take over the garage. Benton Metal Depot supplies metal shop buildings throughout Richmond, with buildings that can be customized to the type of work you actually expect to do inside.
Key Points
- ◦In Montclair, a permit from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division is required once the workshop exceeds 120 square feet.
- ◦Benton Metal Depot is approximately 85.8 miles from Montclair.
- ◦Current lead time for a metal shop building to Montclair is 1 to 2 weeks.
- ◦Decide on the final building dimensions before completing permanent site work.
- ◦The current setback for a workshop in Montclair is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)..
At a Glance
| Permit threshold |
120
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source |
| Wind load zone |
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
110
As of 2026 · Source |
Permits & Setbacks in Richmond County
Figure out the permit requirements while the workshop is still on paper. For a metal shop building in Montclair, a permit from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division is required once the building exceeds 120 square feet, and the current setback is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. Check both before deciding exactly where the shop will sit, particularly if the building will be close to a property line, road or another structure.
Delivery to Montclair
The workshop and the site should be ready for each other at roughly the same time. Residents in Montclair are looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is approximately 85.8 miles away. Make sure any required permitting and site work are accounted for before the workshop reaches the delivery stage.
Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
Can I use a metal shop building for working on cars and trucks?
A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.
How close can I build my workshop to the property line?
The current setback in Montclair is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)., subject to the requirements of Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.
Can I use a metal workshop for woodworking?
Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.
Can I store equipment in my workshop too?
Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.
How should I plan the doors on a metal workshop?
Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.
Should I insulate my metal workshop?
That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.
How many workshop colors can I choose from?
There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.
Do I need a permit for a workshop in Montclair?
The requirements in Montclair are handled by Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Currently, a permit is required once the building exceeds 120 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.
Definitions
- ◦ Panel Gauge
- A measurement associated with the thickness of sheet metal.
- ◦ Clear Span
- Open interior space between the building's exterior supports without columns interrupting the work area.
- ◦ Walk Door
- A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
- ◦ Concrete Slab
- A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
- ◦ Ventilation
- The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Roof Pitch
- The slope of the roof, expressed by how much it rises over a given horizontal distance.
- ◦ Overhead Door
- A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
- ◦ Roof Panel
- A formed metal sheet used as part of the exterior roofing system on the workshop.
Montclair, Richmond County — At a Glance
- Permit Authority Name
- Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
- Permit Authority Url
- https://www.augustaga.gov/2101/Building-Permits
- Permit Threshold Sqft
- 120
- Setback Feet Side Rear
- Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
- Wind Load Zone
- Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 85.8
- Drive Minutes
- 110
- Nearby Towns
- Bonair, Bristol Wood, Belair, Murray Hills
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot manufactures metal building products in Statesboro and has served the region since 2004. The company works with residential, agricultural and commercial projects and uses a single-source coil supplier to maintain consistency in its metal products. Customers in Montclair can request a workshop quote based on the size and specifications of their project.
Ready to talk through your workshops project in Montclair?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://www.augustaga.gov/2099/Building-Construction (2026)
- https://www.augustaga.gov/2101/Building-Permits (2026)
- Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
- Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
- https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
- Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
