A workshop needs to work just as well on the inside as it looks on the outside. Door placement, equipment clearance, workbenches and storage all affect how useful the space will be. Benton Metal Depot supplies metal shop buildings throughout Richmond.

Key Points

  • ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.
  • ◦Workshop customers can choose from 7 available colors.
  • ◦The current setback for a workshop in National Hills is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)..
  • ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
  • ◦Benton Metal Depot is approximately 80.3 miles from National Hills.

At a Glance

Permit threshold 120
As of 2026 · Source
Setback (side/rear) Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source
Wind load zone Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 107
As of 2026 · Source

Permits & Setbacks in Richmond County

A workshop may fit on the property without fitting the local building rules. If you're planning a shop in National Hills, start by checking with Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. The permit requirement applies once the building exceeds 120 square feet, and the current setback is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. Getting those answers early gives you a better idea of how much of the property is actually available for the building before site preparation starts.

Delivery to National Hills

Use the delivery window to get everything else lined up before the workshop is ready. The typical lead time for a metal shop building to National Hills is 1 to 2 weeks. That gives you time to handle permits and coordinate any grading, concrete or other site work. The goal is to have the property ready without scrambling when delivery gets close.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

How many workshop colors can I choose from?

There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.

Do I need a permit for a workshop in National Hills?

The requirements in National Hills are handled by Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Currently, a permit is required once the building exceeds 120 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.

Can I use a metal shop building for working on cars and trucks?

A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.

How should I plan the doors on a metal workshop?

Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.

Should I insulate my metal workshop?

That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.

How close can I build my workshop to the property line?

The current setback in National Hills is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)., subject to the requirements of Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.

Definitions

◦ Overhead Door
A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
◦ Roof Pitch
The slope of the roof, expressed by how much it rises over a given horizontal distance.
◦ Building Permit
Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
◦ Insulation
Material used to reduce heat transfer through the building envelope and help control interior conditions.
◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Wall Panel
A formed metal sheet used to enclose the exterior walls of the shop.
◦ Eave Height
The height of the shop's sidewall where it meets the lower edge of the roof.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.

National Hills, Richmond County — At a Glance

Permit Authority Name
Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
Permit Authority Url
https://www.augustaga.gov/2101/Building-Permits
Permit Threshold Sqft
120
Setback Feet Side Rear
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
Wind Load Zone
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
80.3
Drive Minutes
107
Nearby Towns
Wheless, Augusta, Belair, Murray Hills
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.

Ready to talk through your workshops project in National Hills?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://www.augustaga.gov/2099/Building-Construction (2026)
  4. https://www.augustaga.gov/2101/Building-Permits (2026)
  5. Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
  6. Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
  7. https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
  8. Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
  9. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  10. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  11. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  12. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.