A workshop needs to work just as well on the inside as it looks on the outside. Door placement, equipment clearance, workbenches and storage all affect how useful the space will be. Benton Metal Depot supplies metal shop buildings throughout Richmond.

Key Points

  • ◦The current setback for a workshop in Southlands is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)..
  • ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
  • ◦Decide on the final building dimensions before completing permanent site work.
  • ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.
  • ◦Door size and placement should account for the largest equipment you expect to move into the shop.

At a Glance

Permit threshold 120
As of 2026 · Source
Setback (side/rear) Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source
Wind load zone Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 96
As of 2026 · Source

Permits & Setbacks in Richmond County

Getting the needed permits aren't exactly the exciting part of getting a workshop, but they're much easier to handle before construction begins. The current permit threshold for a workshop in Southlands is 120 square feet, with a setback of Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. Those requirements are handled by Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Local rules can change and individual properties may have additional restrictions, so confirm what applies to the project before committing to the building location or completing permanent site work.

Delivery to Southlands

Once the workshop is ordered, the lead time becomes your project calendar. Current delivery to Southlands is estimated at 1 to 2 weeks. Benton also serves nearby communities including Mechanic Hill, Neco, Westover and Tahoma. Use that time to finish local requirements and prepare the site for the building.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

What should I do before pouring a slab for my workshop?

Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division and coordinate the concrete dimensions with the specifications for your actual building.

How long does it take to get a metal shop building?

Lead time to Southlands is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.

What kind of panels are used on Benton metal workshops?

Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.

What size metal shop building do I need?

Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.

How tall should my metal shop building be?

Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

Can I use a metal shop building for working on cars and trucks?

A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.

Definitions

◦ Ventilation
The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
◦ Concrete Slab
A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Roof Pitch
The slope of the roof, expressed by how much it rises over a given horizontal distance.
◦ Overhead Door
A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
◦ Setback
The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
◦ Bay
A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.

Southlands, Richmond County — At a Glance

Permit Authority Name
Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
Permit Authority Url
https://www.augustaga.gov/2101/Building-Permits
Permit Threshold Sqft
120
Setback Feet Side Rear
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
Wind Load Zone
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
74.3
Drive Minutes
96
Nearby Towns
Mechanic Hill, Neco, Westover, Tahoma
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.

Ready to talk through your workshops project in Southlands?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://www.augustaga.gov/2099/Building-Construction (2026)
  4. https://www.augustaga.gov/2101/Building-Permits (2026)
  5. Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
  6. Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
  7. https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
  8. Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
  9. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  10. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  11. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  12. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.