Workshops in Buckingham Landing 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

A workshop needs to work just as well on the inside as it looks on the outside. Door placement, equipment clearance, workbenches and storage all affect how useful the space will be. Benton Metal Depot supplies metal shop buildings throughout Beaufort.

Key Points

  • ◦Current lead time for a metal shop building to Buckingham Landing is 1 to 2 weeks.
  • ◦Benton Metal Depot is approximately 87.1 miles from Buckingham Landing.
  • ◦In Buckingham Landing, a permit from Beaufort County Community Development Department, Building Codes / Inspections Division is required once the workshop exceeds 200 square feet.
  • ◦Workshop customers can choose from 7 available colors.
  • ◦Decide on the final building dimensions before completing permanent site work.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
As of 2026 · Source
Wind load zone Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 106
As of 2026 · Source

Permits & Setbacks in Beaufort County

Before laying out the workshop on your property, make sure the spot you've chosen can really be used. Workshop permit requirements in Buckingham Landing are handled by Beaufort County Community Development Department, Building Codes / Inspections Division. The current threshold is 200 square feet, but size isn't the only thing to check. Setbacks, zoning and other local requirements may affect the project too. Confirm those details before pouring concrete, grading the site or doing other permanent work.

Delivery to Buckingham Landing

Once the workshop is ordered, the lead time becomes your project calendar. Current delivery to Buckingham Landing is estimated at 1 to 2 weeks. Benton also serves nearby communities including Spanish Wells, Hickory Bluff, Lawton and Folly Field. Use that time to finish local requirements and prepare the site for the building.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Beaufort County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

How tall should my metal shop building be?

Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.

What size metal shop building do I need?

Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.

What kind of panels are used on Benton metal workshops?

Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.

How long does it take to get a metal shop building?

Lead time to Buckingham Landing is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.

What should I do before pouring a slab for my workshop?

Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Beaufort County Community Development Department, Building Codes / Inspections Division and coordinate the concrete dimensions with the specifications for your actual building.

Should I insulate my metal workshop?

That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.

How should I plan the doors on a metal workshop?

Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.

Do I need a permit for a workshop in Buckingham Landing?

The requirements in Buckingham Landing are handled by Beaufort County Community Development Department, Building Codes / Inspections Division. Currently, a permit is required once the building exceeds 200 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.

Definitions

◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Concrete Slab
A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
◦ Ventilation
The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
◦ Setback
The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
◦ Overhead Door
A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
◦ Roof Pitch
The slope of the roof, expressed by how much it rises over a given horizontal distance.
◦ Roof Panel
A formed metal sheet used as part of the exterior roofing system on the workshop.

Buckingham Landing, Beaufort County — At a Glance

Permit Authority Name
Beaufort County Community Development Department, Building Codes / Inspections Division
Permit Authority Url
https://www.beaufortcountysc.gov/building-codes/requirements.html
Permit Threshold Sqft
200
Setback Feet Side Rear
For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
Wind Load Zone
Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
Coastal
1
Drive Miles
87.1
Drive Minutes
106
Nearby Towns
Spanish Wells, Hickory Bluff, Lawton, Folly Field
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal products in Statesboro since 2004 and works with homeowners, contractors and property owners throughout the region. For someone planning a workshop in Buckingham Landing, that means the building package can be based on the actual size, panel specifications and materials the project calls for instead of trying to piece those components together separately.

Ready to talk through your workshops project in Buckingham Landing?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://www.beaufortcountysc.gov/building-codes/index.html (2026)
  4. https://www.beaufortcountysc.gov/building-codes/requirements.html (2026)
  5. https://www.beaufortcountysc.gov/code-enforcement/faq.html ("Accessory structures 200 square feet and larger require a Building Permit... including pre-built structures"; a Zoning Permit is also required before placing any accessory structure) (2026)
  6. https://www.beaufortcountysc.gov/code-enforcement/faq.html — cross-reference against primary Beaufort County Land Development Code, Art. 4 Div. 4.2 "Accessory Uses and Structures" at https://library.municode.com/sc/beaufort_county (2026)
  7. Aggregated from windload.solutions/south-carolina-wind-load-requirements and scbaldwin.com/blog/coastal-building-codes-wind-salt-air-sc — no Beaufort County-specific primary wind-speed map/ordinance page was located; needs verification (2026)
  8. Given/client spec — Beaufort County is a coastal South Carolina county (Atlantic coastline, Sea Islands) (2026)
  9. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  10. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  11. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  12. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.