Reviewed by the Benton Metal Depot team · Updated
Are you repairing equipment, working on vehicles or simply need a place for hobbies and projects? A metal shop building gives you a workspace that's separate from the house. Benton Metal Depot supplies workshop packages to residents in Daufuskie Landing and surrounding communities, with 7 colors available and a lead time of 1 to 2 weeks.
Key Points
- ◦In Daufuskie Landing, a permit from Beaufort County Community Development Department, Building Codes / Inspections Division is required once the workshop exceeds 200 square feet.
- ◦Benton Metal Depot is approximately 101.6 miles from Daufuskie Landing.
- ◦Current lead time for a metal shop building to Daufuskie Landing is 1 to 2 weeks.
- ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
- ◦The current setback for a workshop in Daufuskie Landing is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled..
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
As of 2026 · Source |
| Wind load zone |
Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
293
As of 2026 · Source |
Permits & Setbacks in Beaufort County
Figure out the permit requirements while the workshop is still on paper. For a metal shop building in Daufuskie Landing, a permit from Beaufort County Community Development Department, Building Codes / Inspections Division is required once the building exceeds 200 square feet, and the current setback is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.. Check both before deciding exactly where the shop will sit, particularly if the building will be close to a property line, road or another structure.
Delivery to Daufuskie Landing
Once the workshop is ordered, the lead time becomes your project calendar. Current delivery to Daufuskie Landing is estimated at 1 to 2 weeks. Benton also serves nearby communities including Daufuskie Island, Lawton, Folly Field and Forest Beach. Use that time to finish local requirements and prepare the site for the building.
Representative product photo — a Beaufort County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
How long does it take to get a metal shop building?
Lead time to Daufuskie Landing is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.
What should I do before pouring a slab for my workshop?
Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Beaufort County Community Development Department, Building Codes / Inspections Division and coordinate the concrete dimensions with the specifications for your actual building.
How tall should my metal shop building be?
Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.
What kind of panels are used on Benton metal workshops?
Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.
What size metal shop building do I need?
Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.
Can I use a metal shop building for working on cars and trucks?
A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.
How close can I build my workshop to the property line?
The current setback in Daufuskie Landing is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled., subject to the requirements of Beaufort County Community Development Department, Building Codes / Inspections Division and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.
Can I use a metal workshop for woodworking?
Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.
Definitions
- ◦ Wall Panel
- A formed metal sheet used to enclose the exterior walls of the shop.
- ◦ Eave Height
- The height of the shop's sidewall where it meets the lower edge of the roof.
- ◦ Building Permit
- Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
- ◦ Insulation
- Material used to reduce heat transfer through the building envelope and help control interior conditions.
- ◦ Bay
- A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
- ◦ Roof Panel
- A formed metal sheet used as part of the exterior roofing system on the workshop.
- ◦ Overhead Door
- A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
- ◦ Roof Pitch
- The slope of the roof, expressed by how much it rises over a given horizontal distance.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
Daufuskie Landing, Beaufort County — At a Glance
- Permit Authority Name
- Beaufort County Community Development Department, Building Codes / Inspections Division
- Permit Authority Url
- https://www.beaufortcountysc.gov/building-codes/requirements.html
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
- Wind Load Zone
- Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
- Coastal
- 1
- Drive Miles
- 101.6
- Drive Minutes
- 293
- Nearby Towns
- Daufuskie Island, Lawton, Folly Field, Forest Beach
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.
Ready to talk through your workshops project in Daufuskie Landing?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://www.beaufortcountysc.gov/building-codes/index.html (2026)
- https://www.beaufortcountysc.gov/building-codes/requirements.html (2026)
- https://www.beaufortcountysc.gov/code-enforcement/faq.html ("Accessory structures 200 square feet and larger require a Building Permit... including pre-built structures"; a Zoning Permit is also required before placing any accessory structure) (2026)
- https://www.beaufortcountysc.gov/code-enforcement/faq.html — cross-reference against primary Beaufort County Land Development Code, Art. 4 Div. 4.2 "Accessory Uses and Structures" at https://library.municode.com/sc/beaufort_county (2026)
- Aggregated from windload.solutions/south-carolina-wind-load-requirements and scbaldwin.com/blog/coastal-building-codes-wind-salt-air-sc — no Beaufort County-specific primary wind-speed map/ordinance page was located; needs verification (2026)
- Given/client spec — Beaufort County is a coastal South Carolina county (Atlantic coastline, Sea Islands) (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Beaufort County
See the Beaufort County hub for workshops
