Reviewed by the Benton Metal Depot team · Updated
Do you need a dedicated place where you can work in Folly Field? A workshop gives you room for tools, equipment, storage and projects so you don't take over the garage. Benton Metal Depot supplies metal shop buildings throughout Beaufort, with buildings that can be customized to the type of work you actually expect to do inside.
Key Points
- ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
- ◦The current setback for a workshop in Folly Field is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled..
- ◦Benton Metal Depot is approximately 93.6 miles from Folly Field.
- ◦Workshop customers can choose from 7 available colors.
- ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
As of 2026 · Source |
| Wind load zone |
Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
116
As of 2026 · Source |
Permits & Setbacks in Beaufort County
Getting the needed permits aren't exactly the exciting part of getting a workshop, but they're much easier to handle before construction begins. The current permit threshold for a workshop in Folly Field is 200 square feet, with a setback of For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.. Those requirements are handled by Beaufort County Community Development Department, Building Codes / Inspections Division. Local rules can change and individual properties may have additional restrictions, so confirm what applies to the project before committing to the building location or completing permanent site work.
Delivery to Folly Field
Use the delivery window to get everything else lined up before the workshop is ready. The typical lead time for a metal shop building to Folly Field is 1 to 2 weeks. That gives you time to handle permits and coordinate any grading, concrete or other site work. The goal is to have the property ready without scrambling when delivery gets close.
Representative product photo — a Beaufort County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
How tall should my metal shop building be?
Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.
How close can I build my workshop to the property line?
The current setback in Folly Field is For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled., subject to the requirements of Beaufort County Community Development Department, Building Codes / Inspections Division and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.
Can I use a metal shop building for working on cars and trucks?
A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.
Do I need a permit for a workshop in Folly Field?
The requirements in Folly Field are handled by Beaufort County Community Development Department, Building Codes / Inspections Division. Currently, a permit is required once the building exceeds 200 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.
How many workshop colors can I choose from?
There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.
What should I do before pouring a slab for my workshop?
Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Beaufort County Community Development Department, Building Codes / Inspections Division and coordinate the concrete dimensions with the specifications for your actual building.
How long does it take to get a metal shop building?
Lead time to Folly Field is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.
How should I plan the doors on a metal workshop?
Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.
Definitions
- ◦ Walk Door
- A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
- ◦ Panel Gauge
- A measurement associated with the thickness of sheet metal.
- ◦ Clear Span
- Open interior space between the building's exterior supports without columns interrupting the work area.
- ◦ Concrete Slab
- A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
- ◦ Ventilation
- The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Overhead Door
- A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
- ◦ Roof Pitch
- The slope of the roof, expressed by how much it rises over a given horizontal distance.
- ◦ Insulation
- Material used to reduce heat transfer through the building envelope and help control interior conditions.
Folly Field, Beaufort County — At a Glance
- Permit Authority Name
- Beaufort County Community Development Department, Building Codes / Inspections Division
- Permit Authority Url
- https://www.beaufortcountysc.gov/building-codes/requirements.html
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- For accessory structures 16 ft or less in height: 5 ft from both side and rear property lines. For structures over 16 ft in height, the zoning district's general dimensional standards in the Land Development Ordinance apply instead — those district-specific figures were not independently pulled.
- Wind Load Zone
- Coastal South Carolina Wind Zone 3 / Coastal High-Hazard area — secondary sources put design wind speeds at roughly 130-150 mph, with 150 mph (or 140 mph within one mile of the coastline) commonly cited for SC Wind Zone 3. Exact figure for a specific parcel depends on distance from the coast, ASCE 7 edition, exposure, and risk category, and must be confirmed with an SC-licensed engineer or the county building official before publishing.
- Coastal
- 1
- Drive Miles
- 93.6
- Drive Minutes
- 116
- Nearby Towns
- Lawton, Forest Beach, Hilton Head Island, Spanish Wells
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has manufactured metal products in Statesboro since 2004 and works with homeowners, contractors and property owners throughout the region. For someone planning a workshop in Folly Field, that means the building package can be based on the actual size, panel specifications and materials the project calls for instead of trying to piece those components together separately.
Ready to talk through your workshops project in Folly Field?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://www.beaufortcountysc.gov/building-codes/index.html (2026)
- https://www.beaufortcountysc.gov/building-codes/requirements.html (2026)
- https://www.beaufortcountysc.gov/code-enforcement/faq.html ("Accessory structures 200 square feet and larger require a Building Permit... including pre-built structures"; a Zoning Permit is also required before placing any accessory structure) (2026)
- https://www.beaufortcountysc.gov/code-enforcement/faq.html — cross-reference against primary Beaufort County Land Development Code, Art. 4 Div. 4.2 "Accessory Uses and Structures" at https://library.municode.com/sc/beaufort_county (2026)
- Aggregated from windload.solutions/south-carolina-wind-load-requirements and scbaldwin.com/blog/coastal-building-codes-wind-salt-air-sc — no Beaufort County-specific primary wind-speed map/ordinance page was located; needs verification (2026)
- Given/client spec — Beaufort County is a coastal South Carolina county (Atlantic coastline, Sea Islands) (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Beaufort County
See the Beaufort County hub for workshops
