Are you repairing equipment, working on vehicles or simply need a place for hobbies and projects? A metal shop building gives you a workspace that's separate from the house. Benton Metal Depot supplies workshop packages to residents in Bells Crossroads and surrounding communities, with 7 colors available and a lead time of 1 to 2 weeks.

Key Points

  • ◦Door size and placement should account for the largest equipment you expect to move into the shop.
  • ◦In Bells Crossroads, a permit from Colleton County Planning and Development Department (Building Code Administration) is required once the workshop exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet.
  • ◦Current lead time for a metal shop building to Bells Crossroads is 1 to 2 weeks.
  • ◦Decide on the final building dimensions before completing permanent site work.
  • ◦The current setback for a workshop in Bells Crossroads is Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts..

At a Glance

Permit threshold Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709).
As of 2026 · Source
Setback (side/rear) Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.
As of 2026 · Source
Wind load zone Colleton County is classified in secondary sources as a Coastal High-Hazard Wind Zone (>130 mph, ASCE 7-16/7-22, Risk Category II) within roughly 1 mile of the mean high-water line, tapering toward inland-SC levels (~115-120 mph) further from the coast/tidal rivers. NOT verified against a primary county map; must be confirmed with a SC-licensed engineer or the county building official, especially given how much Colleton's interior extends from the ACE Basin coastline.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 123
As of 2026 · Source

Permits & Setbacks in Colleton County

A workshop may fit on the property without fitting the local building rules. If you're planning a shop in Bells Crossroads, start by checking with Colleton County Planning and Development Department (Building Code Administration). The permit requirement applies once the building exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet, and the current setback is Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.. Getting those answers early gives you a better idea of how much of the property is actually available for the building before site preparation starts.

Delivery to Bells Crossroads

The workshop and the site should be ready for each other at roughly the same time. Residents in Bells Crossroads are looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is approximately 87.8 miles away. Make sure any required permitting and site work are accounted for before the workshop reaches the delivery stage.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Colleton County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

What should I do before pouring a slab for my workshop?

Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Colleton County Planning and Development Department (Building Code Administration) and coordinate the concrete dimensions with the specifications for your actual building.

What kind of panels are used on Benton metal workshops?

Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.

What size metal shop building do I need?

Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.

How long does it take to get a metal shop building?

Lead time to Bells Crossroads is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.

How tall should my metal shop building be?

Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

Do I need a permit for a workshop in Bells Crossroads?

The requirements in Bells Crossroads are handled by Colleton County Planning and Development Department (Building Code Administration). Currently, a permit is required once the building exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.

Definitions

◦ Insulation
Material used to reduce heat transfer through the building envelope and help control interior conditions.
◦ Roof Panel
A formed metal sheet used as part of the exterior roofing system on the workshop.
◦ Bay
A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
◦ Eave Height
The height of the shop's sidewall where it meets the lower edge of the roof.
◦ Wall Panel
A formed metal sheet used to enclose the exterior walls of the shop.
◦ Building Permit
Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Ventilation
The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.

Bells Crossroads, Colleton County — At a Glance

Permit Authority Name
Colleton County Planning and Development Department (Building Code Administration)
Permit Authority Url
https://www.colletoncounty.org/planning-development/building-code-administration
Permit Threshold Sqft
Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709).
Setback Feet Side Rear
Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.
Wind Load Zone
Colleton County is classified in secondary sources as a Coastal High-Hazard Wind Zone (>130 mph, ASCE 7-16/7-22, Risk Category II) within roughly 1 mile of the mean high-water line, tapering toward inland-SC levels (~115-120 mph) further from the coast/tidal rivers. NOT verified against a primary county map; must be confirmed with a SC-licensed engineer or the county building official, especially given how much Colleton's interior extends from the ACE Basin coastline.
Coastal
1
Drive Miles
87.8
Drive Minutes
123
Nearby Towns
Sniders Crossroads, Hudsons Mill, Colleton, Padgetts
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal products in Statesboro since 2004 and works with homeowners, contractors and property owners throughout the region. For someone planning a workshop in Bells Crossroads, that means the building package can be based on the actual size, panel specifications and materials the project calls for instead of trying to piece those components together separately.

Ready to talk through your workshops project in Bells Crossroads?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://www.colletoncounty.org/planning-development/building-code-administration (2026)
  4. https://www.colletoncounty.org/faq/when-do-i-need-zoning-permit (2026)
  5. Colleton County Code of Ordinances, Title 14.08 (Zoning), https://www.colletoncounty.org/sites/default/files/uploads/planning_dev/2022%20Ordinance%20Update/2022-update-zoning-ordinance.pdf — needs direct lookup of the district yard table (2026)
  6. Aggregated from windload.solutions and similar secondary sources — no primary Colleton County wind map found (2026)
  7. Given/client spec — Colleton County is a coastal South Carolina county (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.