A workshop needs to work just as well on the inside as it looks on the outside. Door placement, equipment clearance, workbenches and storage all affect how useful the space will be. Benton Metal Depot supplies metal shop buildings throughout Colleton.
Key Points
- ◦Current lead time for a metal shop building to Wiggins is 1 to 2 weeks.
- ◦Door size and placement should account for the largest equipment you expect to move into the shop.
- ◦Decide on the final building dimensions before completing permanent site work.
- ◦In Wiggins, a permit from Colleton County Planning and Development Department (Building Code Administration) is required once the workshop exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet.
- ◦Workshop customers can choose from 7 available colors.
At a Glance
| Permit threshold |
Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709).
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.
As of 2026 · Source |
| Wind load zone |
Colleton County is classified in secondary sources as a Coastal High-Hazard Wind Zone (>130 mph, ASCE 7-16/7-22, Risk Category II) within roughly 1 mile of the mean high-water line, tapering toward inland-SC levels (~115-120 mph) further from the coast/tidal rivers. NOT verified against a primary county map; must be confirmed with a SC-licensed engineer or the county building official, especially given how much Colleton's interior extends from the ACE Basin coastline.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
159
As of 2026 · Source |
Permits & Setbacks in Colleton County
Figure out the permit requirements while the workshop is still on paper. For a metal shop building in Wiggins, a permit from Colleton County Planning and Development Department (Building Code Administration) is required once the building exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet, and the current setback is Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.. Check both before deciding exactly where the shop will sit, particularly if the building will be close to a property line, road or another structure.
Delivery to Wiggins
Once the workshop is ordered, the lead time becomes your project calendar. Current delivery to Wiggins is estimated at 1 to 2 weeks. Benton also serves nearby communities including Green Pond, Ashepoo Siding, Ashepoo Crossing and Bennetts Point. Use that time to finish local requirements and prepare the site for the building.
Representative product photo — a Colleton County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
How long does it take to get a metal shop building?
Lead time to Wiggins is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.
How tall should my metal shop building be?
Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.
What kind of panels are used on Benton metal workshops?
Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.
What size metal shop building do I need?
Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.
What should I do before pouring a slab for my workshop?
Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Colleton County Planning and Development Department (Building Code Administration) and coordinate the concrete dimensions with the specifications for your actual building.
Should I insulate my metal workshop?
That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.
How should I plan the doors on a metal workshop?
Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.
Can I use a metal shop building for working on cars and trucks?
A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.
Definitions
- ◦ Wall Panel
- A formed metal sheet used to enclose the exterior walls of the shop.
- ◦ Eave Height
- The height of the shop's sidewall where it meets the lower edge of the roof.
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Bay
- A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
- ◦ Roof Panel
- A formed metal sheet used as part of the exterior roofing system on the workshop.
- ◦ Concrete Slab
- A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
- ◦ Ventilation
- The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
- ◦ Overhead Door
- A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
- ◦ Building Permit
- Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
Wiggins, Colleton County — At a Glance
- Permit Authority Name
- Colleton County Planning and Development Department (Building Code Administration)
- Permit Authority Url
- https://www.colletoncounty.org/planning-development/building-code-administration
- Permit Threshold Sqft
- Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709).
- Setback Feet Side Rear
- Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.
- Wind Load Zone
- Colleton County is classified in secondary sources as a Coastal High-Hazard Wind Zone (>130 mph, ASCE 7-16/7-22, Risk Category II) within roughly 1 mile of the mean high-water line, tapering toward inland-SC levels (~115-120 mph) further from the coast/tidal rivers. NOT verified against a primary county map; must be confirmed with a SC-licensed engineer or the county building official, especially given how much Colleton's interior extends from the ACE Basin coastline.
- Coastal
- 1
- Drive Miles
- 120
- Drive Minutes
- 159
- Nearby Towns
- Green Pond, Ashepoo Siding, Ashepoo Crossing, Bennetts Point
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.
Ready to talk through your workshops project in Wiggins?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://www.colletoncounty.org/planning-development/building-code-administration (2026)
- https://www.colletoncounty.org/faq/when-do-i-need-zoning-permit (2026)
- Colleton County Code of Ordinances, Title 14.08 (Zoning), https://www.colletoncounty.org/sites/default/files/uploads/planning_dev/2022%20Ordinance%20Update/2022-update-zoning-ordinance.pdf — needs direct lookup of the district yard table (2026)
- Aggregated from windload.solutions and similar secondary sources — no primary Colleton County wind map found (2026)
- Given/client spec — Colleton County is a coastal South Carolina county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Colleton County
See the Colleton County hub for workshops