Reviewed by the Benton Metal Depot team · Updated
Do you need a dedicated place where you can work in Padgetts? A workshop gives you room for tools, equipment, storage and projects so you don't take over the garage. Benton Metal Depot supplies metal shop buildings throughout Colleton, with buildings that can be customized to the type of work you actually expect to do inside.
Key Points
- ◦Benton Metal Depot is approximately 87.8 miles from Padgetts.
- ◦In Padgetts, a permit from Colleton County Planning and Development Department (Building Code Administration) is required once the workshop exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet.
- ◦Current lead time for a metal shop building to Padgetts is 1 to 2 weeks.
- ◦Decide on the final building dimensions before completing permanent site work.
- ◦The current setback for a workshop in Padgetts is Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts..
At a Glance
| Permit threshold |
Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709).
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.
As of 2026 · Source |
| Wind load zone |
Colleton County is classified in secondary sources as a Coastal High-Hazard Wind Zone (>130 mph, ASCE 7-16/7-22, Risk Category II) within roughly 1 mile of the mean high-water line, tapering toward inland-SC levels (~115-120 mph) further from the coast/tidal rivers. NOT verified against a primary county map; must be confirmed with a SC-licensed engineer or the county building official, especially given how much Colleton's interior extends from the ACE Basin coastline.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
123
As of 2026 · Source |
Permits & Setbacks in Colleton County
A workshop may fit on the property without fitting the local building rules. If you're planning a shop in Padgetts, start by checking with Colleton County Planning and Development Department (Building Code Administration). The permit requirement applies once the building exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet, and the current setback is Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.. Getting those answers early gives you a better idea of how much of the property is actually available for the building before site preparation starts.
Delivery to Padgetts
A little scheduling now can keep the workshop project from turning into several contractors waiting on one another later. Metal workshop delivery to Padgetts currently takes approximately 1 to 2 weeks. Benton Metal Depot is about 87.8 miles away. If concrete or site preparation is needed, use that window to coordinate the work around the expected building schedule.
Representative product photo — a Colleton County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
What size metal shop building do I need?
Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.
What kind of panels are used on Benton metal workshops?
Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.
What should I do before pouring a slab for my workshop?
Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Colleton County Planning and Development Department (Building Code Administration) and coordinate the concrete dimensions with the specifications for your actual building.
How tall should my metal shop building be?
Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.
How long does it take to get a metal shop building?
Lead time to Padgetts is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.
Do I need a permit for a workshop in Padgetts?
The requirements in Padgetts are handled by Colleton County Planning and Development Department (Building Code Administration). Currently, a permit is required once the building exceeds Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709). square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.
How many workshop colors can I choose from?
There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.
Can I use a metal workshop for woodworking?
Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.
Definitions
- ◦ Wall Panel
- A formed metal sheet used to enclose the exterior walls of the shop.
- ◦ Eave Height
- The height of the shop's sidewall where it meets the lower edge of the roof.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
- ◦ Bay
- A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
- ◦ Roof Panel
- A formed metal sheet used as part of the exterior roofing system on the workshop.
- ◦ Ventilation
- The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
- ◦ Concrete Slab
- A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
- ◦ Building Permit
- Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
- ◦ Overhead Door
- A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
Padgetts, Colleton County — At a Glance
- Permit Authority Name
- Colleton County Planning and Development Department (Building Code Administration)
- Permit Authority Url
- https://www.colletoncounty.org/planning-development/building-code-administration
- Permit Threshold Sqft
- Not found — Colleton County FAQ confirms zoning permits are required for accessory structures like "sheds, fences, barns" without stating a sqft exemption; both a building permit and a zoning permit are typically needed. Needs direct confirmation (843-549-1709).
- Setback Feet Side Rear
- Accessory buildings must be separated from the principal structure or other accessory structures by at least 5 ft; district-specific side/rear property-line setback figures for accessory structures were not retrieved from available excerpts.
- Wind Load Zone
- Colleton County is classified in secondary sources as a Coastal High-Hazard Wind Zone (>130 mph, ASCE 7-16/7-22, Risk Category II) within roughly 1 mile of the mean high-water line, tapering toward inland-SC levels (~115-120 mph) further from the coast/tidal rivers. NOT verified against a primary county map; must be confirmed with a SC-licensed engineer or the county building official, especially given how much Colleton's interior extends from the ACE Basin coastline.
- Coastal
- 1
- Drive Miles
- 87.8
- Drive Minutes
- 123
- Nearby Towns
- Sniders Crossroads, Bells Crossroads, Hudsons Mill, Colleton
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.
Ready to talk through your workshops project in Padgetts?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://www.colletoncounty.org/planning-development/building-code-administration (2026)
- https://www.colletoncounty.org/faq/when-do-i-need-zoning-permit (2026)
- Colleton County Code of Ordinances, Title 14.08 (Zoning), https://www.colletoncounty.org/sites/default/files/uploads/planning_dev/2022%20Ordinance%20Update/2022-update-zoning-ordinance.pdf — needs direct lookup of the district yard table (2026)
- Aggregated from windload.solutions and similar secondary sources — no primary Colleton County wind map found (2026)
- Given/client spec — Colleton County is a coastal South Carolina county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Colleton County
See the Colleton County hub for workshops
