Reviewed by the Benton Metal Depot team · Updated
If your tools and equipment have outgrown the garage, a separate workshop may be what you need. Benton Metal Depot supplies metal shop buildings throughout Burke using 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. Residents in Drone can plan the space around workbenches, equipment, storage and the doors needed to move everything in and out.
Key Points
- ◦Benton Metal Depot is approximately 53.6 miles from Drone.
- ◦In Drone, a permit from Burke County Planning Department (Permits and Inspections Division) is required once the workshop exceeds 200 square feet.
- ◦Current lead time for a metal shop building to Drone is 1 to 2 weeks.
- ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
- ◦The current setback for a workshop in Drone is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing..
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
As of 2026 · Source |
| Wind load zone |
Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
66
As of 2026 · Source |
Permits & Setbacks in Burke County
A workshop may fit on the property without fitting the local building rules. If you're planning a shop in Drone, start by checking with Burke County Planning Department (Permits and Inspections Division). The permit requirement applies once the building exceeds 200 square feet, and the current setback is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.. Getting those answers early gives you a better idea of how much of the property is actually available for the building before site preparation starts.
Delivery to Drone
A little scheduling now can keep the workshop project from turning into several contractors waiting on one another later. Metal workshop delivery to Drone currently takes approximately 1 to 2 weeks. Benton Metal Depot is about 53.6 miles away. If concrete or site preparation is needed, use that window to coordinate the work around the expected building schedule.
Representative product photo — a Burke County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
Can I store equipment in my workshop too?
Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.
How long does it take to get a metal shop building?
Lead time to Drone is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.
Can I use a metal workshop for woodworking?
Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.
What kind of panels are used on Benton metal workshops?
Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.
Should I insulate my metal workshop?
That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.
What size metal shop building do I need?
Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.
How should I plan the doors on a metal workshop?
Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.
How close can I build my workshop to the property line?
The current setback in Drone is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing., subject to the requirements of Burke County Planning Department (Permits and Inspections Division) and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.
Definitions
- ◦ Bay
- A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
- ◦ Roof Panel
- A formed metal sheet used as part of the exterior roofing system on the workshop.
- ◦ Insulation
- Material used to reduce heat transfer through the building envelope and help control interior conditions.
- ◦ Building Permit
- Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.
- ◦ Wall Panel
- A formed metal sheet used to enclose the exterior walls of the shop.
- ◦ Eave Height
- The height of the shop's sidewall where it meets the lower edge of the roof.
- ◦ Clear Span
- Open interior space between the building's exterior supports without columns interrupting the work area.
- ◦ Panel Gauge
- A measurement associated with the thickness of sheet metal.
- ◦ Walk Door
- A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
- ◦ Concrete Slab
- A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
Drone, Burke County — At a Glance
- Permit Authority Name
- Burke County Planning Department (Permits and Inspections Division)
- Permit Authority Url
- https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
- Wind Load Zone
- Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 53.6
- Drive Minutes
- 66
- Nearby Towns
- Munnerlyn, Idlewood, Telfair Woods, Alexander
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot manufactures metal building products in Statesboro and has served the region since 2004. The company works with residential, agricultural and commercial projects and uses a single-source coil supplier to maintain consistency in its metal products. Customers in Drone can request a workshop quote based on the size and specifications of their project.
Ready to talk through your workshops project in Drone?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php (2026)
- https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php ("accessory storage buildings less than 200 square feet may be exempt from a building permit but building setbacks shall still be considered"); the same page also references a general ~$1,500 construction-value threshold for permits — confirm how the two thresholds interact (2026)
- https://library.municode.com/ga/burke_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH26LADECO_ARTIVSIDEST (not independently re-extractable as text in this pass — needs direct manual review) (2026)
- General ASCE 7 inland-Georgia range (aggregated secondary sources) — no county-specific or primary map source found (2026)
- Burke County is well inland (east Georgia, near Augusta) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
