Workshops in Murray Hill 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

A workshop needs to work just as well on the inside as it looks on the outside. Door placement, equipment clearance, workbenches and storage all affect how useful the space will be. Benton Metal Depot supplies metal shop buildings throughout Burke.

Key Points

  • ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
  • ◦The current setback for a workshop in Murray Hill is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing..
  • ◦Benton Metal Depot is approximately 45.8 miles from Murray Hill.
  • ◦Workshop customers can choose from 7 available colors.
  • ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
As of 2026 · Source
Wind load zone Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 60
As of 2026 · Source

Permits & Setbacks in Burke County

Getting the needed permits aren't exactly the exciting part of getting a workshop, but they're much easier to handle before construction begins. The current permit threshold for a workshop in Murray Hill is 200 square feet, with a setback of CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.. Those requirements are handled by Burke County Planning Department (Permits and Inspections Division). Local rules can change and individual properties may have additional restrictions, so confirm what applies to the project before committing to the building location or completing permanent site work.

Delivery to Murray Hill

A little scheduling now can keep the workshop project from turning into several contractors waiting on one another later. Metal workshop delivery to Murray Hill currently takes approximately 1 to 2 weeks. Benton Metal Depot is about 45.8 miles away. If concrete or site preparation is needed, use that window to coordinate the work around the expected building schedule.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Burke County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

What should I do before pouring a slab for my workshop?

Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Burke County Planning Department (Permits and Inspections Division) and coordinate the concrete dimensions with the specifications for your actual building.

How long does it take to get a metal shop building?

Lead time to Murray Hill is approximately 1 to 2 weeks. You can use that period to work through permits and any site preparation the project requires. If you're coordinating concrete or contractors, base their schedules on the timeline of your order rather than a general estimate.

What size metal shop building do I need?

Start with your largest equipment and work backward from there. Add space for workbenches, toolboxes, shelving and clear walking areas. If vehicles or machinery will be worked on inside, allow room around them rather than just enough space to park them. It's also smart to plan for tools or equipment you may add later.

What kind of panels are used on Benton metal workshops?

Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. The panel specification is worth checking when you're comparing workshops because the metal roofing and siding make up the exterior envelope of the structure. Benton manufactures metal building products in Statesboro and can quote the materials based on the specifications of the workshop you want to get.

How tall should my metal shop building be?

Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

How close can I build my workshop to the property line?

The current setback in Murray Hill is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing., subject to the requirements of Burke County Planning Department (Permits and Inspections Division) and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.

Definitions

◦ Roof Pitch
The slope of the roof, expressed by how much it rises over a given horizontal distance.
◦ Overhead Door
A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
◦ Setback
The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
◦ Ventilation
The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
◦ Concrete Slab
A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Building Permit
Local government approval allowing construction to proceed under the building and zoning requirements that apply to the project.

Murray Hill, Burke County — At a Glance

Permit Authority Name
Burke County Planning Department (Permits and Inspections Division)
Permit Authority Url
https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php
Permit Threshold Sqft
200
Setback Feet Side Rear
CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
Wind Load Zone
Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
45.8
Drive Minutes
60
Nearby Towns
Sardis, Hills Store, Rock Fence Crossroads, Girard
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal products in Statesboro since 2004 and works with homeowners, contractors and property owners throughout the region. For someone planning a workshop in Murray Hill, that means the building package can be based on the actual size, panel specifications and materials the project calls for instead of trying to piece those components together separately.

Ready to talk through your workshops project in Murray Hill?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php (2026)
  4. https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php ("accessory storage buildings less than 200 square feet may be exempt from a building permit but building setbacks shall still be considered"); the same page also references a general ~$1,500 construction-value threshold for permits — confirm how the two thresholds interact (2026)
  5. https://library.municode.com/ga/burke_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH26LADECO_ARTIVSIDEST (not independently re-extractable as text in this pass — needs direct manual review) (2026)
  6. General ASCE 7 inland-Georgia range (aggregated secondary sources) — no county-specific or primary map source found (2026)
  7. Burke County is well inland (east Georgia, near Augusta) and is not among the coastal counties named in the client spec (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.