Reviewed by the Benton Metal Depot team · Updated
Are you repairing equipment, working on vehicles or simply need a place for hobbies and projects? A metal shop building gives you a workspace that's separate from the house. Benton Metal Depot supplies workshop packages to residents in Dyes Crossroad and surrounding communities, with 7 colors available and a lead time of 1 to 2 weeks.
Key Points
- ◦Workshop customers can choose from 7 available colors.
- ◦Decide on the final building dimensions before completing permanent site work.
- ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.
- ◦Door size and placement should account for the largest equipment you expect to move into the shop.
- ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
As of 2026 · Source |
| Wind load zone |
Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source |
| Drive time from Statesboro |
100
As of 2026 · Source |
Permits & Setbacks in Burke County
A workshop may fit on the property without fitting the local building rules. If you're planning a shop in Dyes Crossroad, start by checking with Burke County Planning Department (Permits and Inspections Division). The permit requirement applies once the building exceeds 200 square feet, and the current setback is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.. Getting those answers early gives you a better idea of how much of the property is actually available for the building before site preparation starts.
Delivery to Dyes Crossroad
Use the delivery window to get everything else lined up before the workshop is ready. The typical lead time for a metal shop building to Dyes Crossroad is 1 to 2 weeks. That gives you time to handle permits and coordinate any grading, concrete or other site work. The goal is to have the property ready without scrambling when delivery gets close.
Representative product photo — a Burke County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
How close can I build my workshop to the property line?
The current setback in Dyes Crossroad is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing., subject to the requirements of Burke County Planning Department (Permits and Inspections Division) and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.
Can I use a metal shop building for working on cars and trucks?
A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.
What should I do before pouring a slab for my workshop?
Finalize the building dimensions and confirm the local requirements first. You don't want to discover after the concrete is down that the slab is the wrong size or the shop is sitting too close to a property line. Check the requirements with Burke County Planning Department (Permits and Inspections Division) and coordinate the concrete dimensions with the specifications for your actual building.
How tall should my metal shop building be?
Think about what's going through the doors and what will happen inside. Taller vehicles, equipment, lifts or overhead storage can all affect the height you need. Don't choose wall height based only on how the building looks from outside. Make sure the interior clearance works with both your current equipment and anything you're likely to add later.
Do I need a permit for a workshop in Dyes Crossroad?
The requirements in Dyes Crossroad are handled by Burke County Planning Department (Permits and Inspections Division). Currently, a permit is required once the building exceeds 200 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.
How many workshop colors can I choose from?
There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.
Can I use a metal workshop for woodworking?
Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.
Can I store equipment in my workshop too?
Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.
Definitions
- ◦ Lead Time
- The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
- ◦ Setback
- The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
- ◦ Eave Height
- The height of the shop's sidewall where it meets the lower edge of the roof.
- ◦ Wall Panel
- A formed metal sheet used to enclose the exterior walls of the shop.
- ◦ Roof Panel
- A formed metal sheet used as part of the exterior roofing system on the workshop.
- ◦ Bay
- A section of the building between structural supports. Bay spacing can affect how the interior and exterior openings are laid out.
- ◦ Concrete Slab
- A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
- ◦ Ventilation
- The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
- ◦ Roof Pitch
- The slope of the roof, expressed by how much it rises over a given horizontal distance.
- ◦ Overhead Door
- A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
Dyes Crossroad, Burke County — At a Glance
- Permit Authority Name
- Burke County Planning Department (Permits and Inspections Division)
- Permit Authority Url
- https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
- Wind Load Zone
- Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 78.1
- Drive Minutes
- 100
- Nearby Towns
- Bath, Blythe, Windsor Spring, Ellwood
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot manufactures metal building products in Statesboro and has served the region since 2004. The company works with residential, agricultural and commercial projects and uses a single-source coil supplier to maintain consistency in its metal products. Customers in Dyes Crossroad can request a workshop quote based on the size and specifications of their project.
Ready to talk through your workshops project in Dyes Crossroad?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
- https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php (2026)
- https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php ("accessory storage buildings less than 200 square feet may be exempt from a building permit but building setbacks shall still be considered"); the same page also references a general ~$1,500 construction-value threshold for permits — confirm how the two thresholds interact (2026)
- https://library.municode.com/ga/burke_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH26LADECO_ARTIVSIDEST (not independently re-extractable as text in this pass — needs direct manual review) (2026)
- General ASCE 7 inland-Georgia range (aggregated secondary sources) — no county-specific or primary map source found (2026)
- Burke County is well inland (east Georgia, near Augusta) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
