Workshops in Magruder 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

If your tools and equipment have outgrown the garage, a separate workshop may be what you need. Benton Metal Depot supplies metal shop buildings throughout Burke using 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels. Residents in Magruder can plan the space around workbenches, equipment, storage and the doors needed to move everything in and out.

Key Points

  • ◦Plan enough moving room around workbenches, tools and equipment to work comfortably.
  • ◦Workshop customers can choose from 7 available colors.
  • ◦Benton Metal Depot is approximately 52.7 miles from Magruder.
  • ◦The current setback for a workshop in Magruder is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing..
  • ◦Benton's metal shop buildings use 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures. panels.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
As of 2026 · Source
Wind load zone Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 74
As of 2026 · Source

Permits & Setbacks in Burke County

Getting the needed permits aren't exactly the exciting part of getting a workshop, but they're much easier to handle before construction begins. The current permit threshold for a workshop in Magruder is 200 square feet, with a setback of CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.. Those requirements are handled by Burke County Planning Department (Permits and Inspections Division). Local rules can change and individual properties may have additional restrictions, so confirm what applies to the project before committing to the building location or completing permanent site work.

Delivery to Magruder

Once the workshop is ordered, the lead time becomes your project calendar. Current delivery to Magruder is estimated at 1 to 2 weeks. Benton also serves nearby communities including Colemans Lake, Gertrude, Summertown and Midville. Use that time to finish local requirements and prepare the site for the building.

Metal workshop building with vehicle lift by Benton Metal Depot

Representative product photo — a Burke County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Can I use a metal shop building for working on cars and trucks?

A metal shop building can be planned for vehicle work, but think carefully about the interior dimensions and the moving room. You'll need enough space for the vehicle, open doors, tools and room to move around while you're working. The overhead door also needs to accommodate the vehicles or equipment you expect to bring inside.

How close can I build my workshop to the property line?

The current setback in Magruder is CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing., subject to the requirements of Burke County Planning Department (Permits and Inspections Division) and your particular property. That distance can affect where the shop fits, especially on a smaller lot. Confirm the setback before marking the final location so you don't design the rest of the site around a spot that can't be used.

Can I use a metal workshop for woodworking?

Yes. A metal shop can give you dedicated space for saws, benches, lumber storage and other woodworking equipment. Plan the layout before choosing the building size because stationary tools need working clearance around them. Electrical requirements, lighting, ventilation and dust collection should also be considered separately when planning how the finished interior will function.

Can I store equipment in my workshop too?

Absolutely. Many shops do double duty as work and storage space. Just make sure storage doesn't consume the room you need to actually work. Shelving and equipment placed around the perimeter can help preserve open floor space. If large machinery will be stored inside, include its dimensions when you're deciding how large the building needs to be.

How should I plan the doors on a metal workshop?

Start with the largest thing that needs to pass through them. Vehicles, tractors, machinery and other equipment can require more clearance than a standard entry. Then think about where those items need to go once they're inside. Good door placement lets you move equipment without constantly rearranging tools, workbenches or stored materials.

Should I insulate my metal workshop?

That depends on how you'll use the shop and how much time you'll spend inside it. If heating, cooling or interior comfort matters, insulation is worth considering during the planning stage. Benton lists insulation products among its building accessories, but the appropriate system depends on the building and project requirements. Plan for it before finishing the interior.

How many workshop colors can I choose from?

There are currently 7 colors available for metal shop buildings. Color can be purely a matter of preference, or you may want the shop to coordinate with your home, barn or another building already on the property. It's worth looking at the available finishes before finalizing the exterior rather than treating color as a last-minute decision.

Do I need a permit for a workshop in Magruder?

The requirements in Magruder are handled by Burke County Planning Department (Permits and Inspections Division). Currently, a permit is required once the building exceeds 200 square feet. Other local rules can affect the building location as well, so check the requirements before pouring concrete or doing permanent site work. It's easier to change the plan before the property has been prepared.

Definitions

◦ Walk Door
A standard entry door for people, so the larger equipment or vehicle door doesn't have to be opened every time someone enters.
◦ Panel Gauge
A measurement associated with the thickness of sheet metal.
◦ Clear Span
Open interior space between the building's exterior supports without columns interrupting the work area.
◦ Concrete Slab
A poured concrete surface that can serve as the shop floor and part of the building's foundation system when the design calls for one.
◦ Ventilation
The movement of air into and out of the workshop to help manage heat, moisture, fumes or airborne material produced by certain types of work.
◦ Lead Time
The period between ordering or finalizing the shop package and the point when it is ready for the next stage.
◦ Setback
The minimum distance the workshop must remain from a property line, road or another boundary covered by local rules.
◦ Overhead Door
A large door that opens upward and is commonly used for vehicle, machinery or equipment access.
◦ Roof Pitch
The slope of the roof, expressed by how much it rises over a given horizontal distance.
◦ Roof Panel
A formed metal sheet used as part of the exterior roofing system on the workshop.

Magruder, Burke County — At a Glance

Permit Authority Name
Burke County Planning Department (Permits and Inspections Division)
Permit Authority Url
https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php
Permit Threshold Sqft
200
Setback Feet Side Rear
CAUTION: an earlier search synthesis returned a "15 ft from property lines, 80 ft front setback on vacant parcels" figure, but that mixed in material from Burke County, North Carolina (burkenc.org), an unrelated jurisdiction — NOT used here as a confirmed Burke County, GA fact. The real setback figures should be pulled directly from Burke County, GA's own ordinance (Code of Ordinances Ch. 26, Art. IV) before publishing.
Wind Load Zone
Inland east Georgia (Burke County borders the Savannah River near Augusta) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
52.7
Drive Minutes
74
Nearby Towns
Colemans Lake, Gertrude, Summertown, Midville
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

A useful workshop starts with how you're going to work inside it. The building needs enough room for your equipment, tools and storage, along with doors that make sense for what moves in and out. Benton Metal Depot works with customers on metal building projects and supplies the panels, trim and related materials needed to bring those plans together.

Ready to talk through your workshops project in Magruder?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for workshops specifically. (2026)
  3. https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php (2026)
  4. https://burkecounty-ga.gov/departments/planning_department/permits_and_inspections.php ("accessory storage buildings less than 200 square feet may be exempt from a building permit but building setbacks shall still be considered"); the same page also references a general ~$1,500 construction-value threshold for permits — confirm how the two thresholds interact (2026)
  5. https://library.municode.com/ga/burke_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH26LADECO_ARTIVSIDEST (not independently re-extractable as text in this pass — needs direct manual review) (2026)
  6. General ASCE 7 inland-Georgia range (aggregated secondary sources) — no county-specific or primary map source found (2026)
  7. Burke County is well inland (east Georgia, near Augusta) and is not among the coastal counties named in the client spec (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.