Reviewed by the Benton Metal Depot team · Updated
Do you have one horse, or several of them? It's important that the barn is suitable for both the animals and the people caring for them. Benton Metal Depot serves customers in Hardeeville and throughout Jasper with agricultural metal building materials, including 29-gauge and 26-gauge Rib panels panels for applicable barn packages.
Key Points
- ◦Current lead time for horse barn materials to Hardeeville is 1 to 2 weeks.
- ◦Ventilation, drainage and access to fresh water should be considered during barn planning.
- ◦In Hardeeville, a permit from Jasper County Planning and Building Services Department is required once the barn exceeds 200 square feet.
- ◦Aisle width should allow horses and handlers to move comfortably and safely.
- ◦Plan stall dimensions around the horses that will actually use them.
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
As of 2026 · Source |
| Wind load zone |
Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels
As of 2026 · Source |
| Drive time from Statesboro |
83
As of 2026 · Source |
Permits & Setbacks in Jasper County
Check the building rules before you settle on a location for the barn. Horse barn permit requirements in Hardeeville are handled by Jasper County Planning and Building Services Department. The current threshold is 200 square feet, but building size may not be the only consideration. Zoning, setbacks and how the property will be used can also affect the project. Confirm those details before preparing the site or beginning permanent construction work.
Delivery to Hardeeville
A little planning ahead can make barn delivery much easier, especially on a working property. Horse barn material delivery to Hardeeville currently takes approximately 1 to 2 weeks. Benton Metal Depot is approximately 65 miles away. Make sure delivery vehicles can reach the unloading area and that any necessary site work is handled before the materials are scheduled to arrive.
Representative product photo — a Jasper County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
Can I store hay and feed inside my horse barn?
You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.
How wide should the aisle in a horse barn be?
The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.
Do I need a permit for a horse barn in Hardeeville?
The requirements for Hardeeville are handled by Jasper County Planning and Building Services Department. Currently, a permit is required once the barn exceeds 200 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.
How many colors are available for a horse barn?
Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.
How close can I build a horse barn to my property line?
The current setback in Hardeeville is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)., subject to the requirements of Jasper County Planning and Building Services Department and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.
What size should horse stalls be?
Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.
Is a metal horse barn too hot for Georgia summers?
A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Hardeeville, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.
Can I add a tack room and wash area to my horse barn?
Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.
Definitions
- ◦ Setback
- The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
- ◦ Roof Pitch
- The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
- ◦ Feed Room
- A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
- ◦ Post-Frame Construction
- A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
- ◦ Eave Height
- The height of the barn's exterior wall where it meets the lower edge of the roof.
- ◦ Tack Room
- A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
- ◦ Stall Partition
- A wall or divider separating one horse stall from another or from an adjacent area.
- ◦ Panel Gauge
- A measurement related to sheet-metal thickness.
- ◦ Lead Time
- The period needed to process and prepare the building materials after the relevant order stage.
- ◦ Condensation
- Moisture that forms when humid air contacts a sufficiently cool surface. Poorly managed condensation can cause damp conditions inside a barn.
Hardeeville, Jasper County — At a Glance
- Permit Authority Name
- Jasper County Planning and Building Services Department
- Permit Authority Url
- https://www.jaspercountysc.gov/services/planning-and-building/
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
- Wind Load Zone
- Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
- Coastal
- 1
- Drive Miles
- 65
- Drive Minutes
- 83
- Nearby Towns
- Pritchard, Mill Stone Landing, Levy, Baker Hill
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has manufactured metal building products in Statesboro since 2004 and supplies materials for agricultural projects throughout the region. For someone planning a horse barn in Hardeeville, that means working with a regional supplier familiar with metal roofing, siding and the materials used on farm buildings. The barn's design and animal-housing requirements should be worked out alongside the material specifications.
Ready to talk through your horse barns project in Hardeeville?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ (2026)
- Jasper County Code § 20.90.060 (Improvement Location Permit), as cited by https://jasper.county.codes/JCC/20.90.060 and summarized by secondary sources: "residential accessory structures less than 200 square feet, commercial accessory structures less than 120 square feet" are exempt from a building permit (zoning/setback compliance still required). Verify against the primary code text directly. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ordinances-regulations/ (2026)
- Aggregated from windload.solutions (South Carolina Wind Load Requirements) and general ASCE 7-16 coastal SC guidance — no Jasper County-specific primary map source found (2026)
- Given/client spec — Jasper County, SC is a coastal county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Jasper County
See the Jasper County hub for horse barns
