Reviewed by the Benton Metal Depot team · Updated
If you're building a horse barn in Old House, don't plan around stalls alone. You'll also need to think about airflow, water access, feed, tack and where the horses will enter and leave. Benton Metal Depot supplies metal building materials throughout Jasper, with 7 exterior colors available for applicable packages.
Key Points
- ◦Benton Metal Depot is approximately 79 miles from Old House.
- ◦Plan stall dimensions around the horses that will actually use them.
- ◦Horse barn exterior materials are available in 7 colors.
- ◦The current local setback for a horse barn in Old House is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)..
- ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
As of 2026 · Source |
| Wind load zone |
Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels
As of 2026 · Source |
| Drive time from Statesboro |
93
As of 2026 · Source |
Permits & Setbacks in Jasper County
Get the permit questions answered early so they don't hold up the rest of the project. The current permit threshold for a horse barn in Old House is 200 square feet, with a setback of Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).. Those requirements fall under Jasper County Planning and Building Services Department. Agricultural buildings can have different rules depending on their use and location, so verify what applies to your property before pouring concrete or completing other permanent site work.
Delivery to Old House
Once you know what barn you need, the next step is getting the property ready for it. The typical lead time for a horse barn package to Old House is 1 to 2 weeks. Use that window to handle permits, access and any site preparation. If you're arranging grading or concrete work, coordinate those jobs with the building specifications and expected delivery schedule.
Representative product photo — a Jasper County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
Should a horse barn have insulation?
That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.
How many colors are available for a horse barn?
Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.
Do I need a permit for a horse barn in Old House?
The requirements for Old House are handled by Jasper County Planning and Building Services Department. Currently, a permit is required once the barn exceeds 200 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.
What kind of floor is best for a horse barn?
Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.
What size should horse stalls be?
Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.
How close can I build a horse barn to my property line?
The current setback in Old House is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)., subject to the requirements of Jasper County Planning and Building Services Department and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.
What kind of metal panels does Benton use for horse barns?
The applicable horse barn package uses 29-gauge and 26-gauge Rib panels panels. Metal roofing and siding help enclose the building and protect it from the weather, but panel selection is only part of planning a barn. Ventilation, condensation control and the safety of surfaces horses can reach should also be addressed in the finished design.
How big should a horse barn be?
Start with the number and size of your horses, then add the space needed for safe handling and daily care. Stalls are only one part of the layout. You'll also need room for aisles, doors, feed, tack and possibly a wash area. If you expect to add horses later, think about that before choosing the building dimensions.
Definitions
- ◦ Lead Time
- The period needed to process and prepare the building materials after the relevant order stage.
- ◦ Panel Gauge
- A measurement related to sheet-metal thickness.
- ◦ Horse Stall
- An individual enclosed space inside a barn where a horse can rest, eat and be housed.
- ◦ Wash Stall
- An area designed for washing or grooming horses, with suitable water access, drainage and slip-resistant footing.
- ◦ Dutch Door
- A door divided into upper and lower sections that can open separately. Some horse barns use them for stall or exterior access.
- ◦ Center Aisle
- A passageway running through the barn, usually with stalls or other rooms along one or both sides.
- ◦ Roof Pitch
- The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
- ◦ Setback
- The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
- ◦ Ridge Vent
- A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
- ◦ Eave Height
- The height of the barn's exterior wall where it meets the lower edge of the roof.
Old House, Jasper County — At a Glance
- Permit Authority Name
- Jasper County Planning and Building Services Department
- Permit Authority Url
- https://www.jaspercountysc.gov/services/planning-and-building/
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
- Wind Load Zone
- Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
- Coastal
- 1
- Drive Miles
- 79
- Drive Minutes
- 93
- Nearby Towns
- Grahamville, Mitchellville, Bashan, Jasper
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has served contractors and property owners from Statesboro since 2004. The company manufactures metal roofing products and uses a single-source coil supplier to help maintain color consistency. For customers building a horse barn in Old House, Benton can supply applicable metal roofing and siding materials based on the project's specifications and selected finishes.
Ready to talk through your horse barns project in Old House?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ (2026)
- Jasper County Code § 20.90.060 (Improvement Location Permit), as cited by https://jasper.county.codes/JCC/20.90.060 and summarized by secondary sources: "residential accessory structures less than 200 square feet, commercial accessory structures less than 120 square feet" are exempt from a building permit (zoning/setback compliance still required). Verify against the primary code text directly. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ordinances-regulations/ (2026)
- Aggregated from windload.solutions (South Carolina Wind Load Requirements) and general ASCE 7-16 coastal SC guidance — no Jasper County-specific primary map source found (2026)
- Given/client spec — Jasper County, SC is a coastal county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Jasper County
See the Jasper County hub for horse barns
