Reviewed by the Benton Metal Depot team · Updated
A good horse barn gives you shelter, storage and enough room to handle everyday chores without everything feeling crowded. Benton Metal Depot supplies agricultural building materials for properties in Mill Stone Landing and nearby communities, with a lead time of 1 to 2 weeks. Knowing this gives you a starting point for planning the rest of the project.
Key Points
- ◦In Mill Stone Landing, a permit from Jasper County Planning and Building Services Department is required once the barn exceeds 200 square feet.
- ◦Benton Metal Depot is approximately 65 miles from Mill Stone Landing.
- ◦Current lead time for horse barn materials to Mill Stone Landing is 1 to 2 weeks.
- ◦Aisle width should allow horses and handlers to move comfortably and safely.
- ◦The current local setback for a horse barn in Mill Stone Landing is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)..
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
As of 2026 · Source |
| Wind load zone |
Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels
As of 2026 · Source |
| Drive time from Statesboro |
83
As of 2026 · Source |
Permits & Setbacks in Jasper County
Check the building rules before you settle on a location for the barn. Horse barn permit requirements in Mill Stone Landing are handled by Jasper County Planning and Building Services Department. The current threshold is 200 square feet, but building size may not be the only consideration. Zoning, setbacks and how the property will be used can also affect the project. Confirm those details before preparing the site or beginning permanent construction work.
Delivery to Mill Stone Landing
A little planning ahead can make barn delivery much easier, especially on a working property. Horse barn material delivery to Mill Stone Landing currently takes approximately 1 to 2 weeks. Benton Metal Depot is approximately 65 miles away. Make sure delivery vehicles can reach the unloading area and that any necessary site work is handled before the materials are scheduled to arrive.
Representative product photo — a Jasper County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
What kind of floor is best for a horse barn?
Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.
How long does it take to get horse barn materials delivered?
Current delivery to Mill Stone Landing is estimated at 1 to 2 weeks. Use that window to work through permits, contractor schedules and site preparation. Confirm the estimate for your specific order when placing it and planning the overall construction schedule.
What kind of metal panels does Benton use for horse barns?
The applicable horse barn package uses 29-gauge and 26-gauge Rib panels panels. Metal roofing and siding help enclose the building and protect it from the weather, but panel selection is only part of planning a barn. Ventilation, condensation control and the safety of surfaces horses can reach should also be addressed in the finished design.
How big should a horse barn be?
Start with the number and size of your horses, then add the space needed for safe handling and daily care. Stalls are only one part of the layout. You'll also need room for aisles, doors, feed, tack and possibly a wash area. If you expect to add horses later, think about that before choosing the building dimensions.
Should a horse barn have insulation?
That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.
Can I store hay and feed inside my horse barn?
You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.
How wide should the aisle in a horse barn be?
The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.
How close can I build a horse barn to my property line?
The current setback in Mill Stone Landing is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)., subject to the requirements of Jasper County Planning and Building Services Department and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.
Definitions
- ◦ Panel Gauge
- A measurement related to sheet-metal thickness.
- ◦ Lead Time
- The period needed to process and prepare the building materials after the relevant order stage.
- ◦ Feed Room
- A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
- ◦ Post-Frame Construction
- A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
- ◦ Eave Height
- The height of the barn's exterior wall where it meets the lower edge of the roof.
- ◦ Tack Room
- A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
- ◦ Stall Partition
- A wall or divider separating one horse stall from another or from an adjacent area.
- ◦ Setback
- The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
- ◦ Roof Pitch
- The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
- ◦ Ridge Vent
- A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
Mill Stone Landing, Jasper County — At a Glance
- Permit Authority Name
- Jasper County Planning and Building Services Department
- Permit Authority Url
- https://www.jaspercountysc.gov/services/planning-and-building/
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
- Wind Load Zone
- Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
- Coastal
- 1
- Drive Miles
- 65
- Drive Minutes
- 83
- Nearby Towns
- Pritchard, Levy, Baker Hill, Deerfield
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels
- Color Count
- 7
Why Benton Metal Depot
A horse barn involves more planning than choosing a roof and four walls. You have to think about the animals, the people caring for them and how the building will be used every day. Benton Metal Depot supplies metal panels, trim and related building materials for agricultural projects, allowing customers to coordinate those exterior materials with the rest of their barn plans.
Ready to talk through your horse barns project in Mill Stone Landing?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ (2026)
- Jasper County Code § 20.90.060 (Improvement Location Permit), as cited by https://jasper.county.codes/JCC/20.90.060 and summarized by secondary sources: "residential accessory structures less than 200 square feet, commercial accessory structures less than 120 square feet" are exempt from a building permit (zoning/setback compliance still required). Verify against the primary code text directly. (2026)
- https://www.jaspercountysc.gov/services/planning-and-building/ordinances-regulations/ (2026)
- Aggregated from windload.solutions (South Carolina Wind Load Requirements) and general ASCE 7-16 coastal SC guidance — no Jasper County-specific primary map source found (2026)
- Given/client spec — Jasper County, SC is a coastal county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Jasper County
See the Jasper County hub for horse barns
