Horse Barns in Nevadum 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

Are you planning on getting a horse barn in Nevadum? A good way to start is considering the horses and how you'll care for them each day. Their stalls, feed storage, tack and a clear aisle all need room. Benton Metal Depot supplies metal building materials for agricultural projects throughout Jasper.

Key Points

  • ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
  • ◦The current local setback for a horse barn in Nevadum is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)..
  • ◦Horse barn exterior materials are available in 7 colors.
  • ◦Plan stall dimensions around the horses that will actually use them.
  • ◦Benton Metal Depot is approximately 79 miles from Nevadum.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
As of 2026 · Source
Wind load zone Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 93
As of 2026 · Source

Permits & Setbacks in Jasper County

Get the permit questions answered early so they don't hold up the rest of the project. The current permit threshold for a horse barn in Nevadum is 200 square feet, with a setback of Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).. Those requirements fall under Jasper County Planning and Building Services Department. Agricultural buildings can have different rules depending on their use and location, so verify what applies to your property before pouring concrete or completing other permanent site work.

Delivery to Nevadum

A little planning ahead can make barn delivery much easier, especially on a working property. Horse barn material delivery to Nevadum currently takes approximately 1 to 2 weeks. Benton Metal Depot is approximately 79 miles away. Make sure delivery vehicles can reach the unloading area and that any necessary site work is handled before the materials are scheduled to arrive.

Metal horse barn by Benton Metal Depot

Representative product photo — a Jasper County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

What kind of floor is best for a horse barn?

Different parts of the barn may need different flooring. Stalls, aisles, wash areas and storage rooms don't necessarily work best with the same surface. Drainage, footing, cleaning and slip resistance should guide the decision. Plan the floor system with someone familiar with horse facilities before installing concrete or other permanent surfaces.

How close can I build a horse barn to my property line?

The current setback in Nevadum is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)., subject to the requirements of Jasper County Planning and Building Services Department and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.

What size should horse stalls be?

Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.

Do I need a permit for a horse barn in Nevadum?

The requirements for Nevadum are handled by Jasper County Planning and Building Services Department. Currently, a permit is required once the barn exceeds 200 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.

How many colors are available for a horse barn?

Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.

Should a horse barn have insulation?

That depends on the building design, local climate and how the barn will be used. Insulation may help manage heat transfer and condensation, but it doesn't replace ventilation. In horse housing, airflow and moisture control are important. Discuss the complete roof and wall assembly with the building designer before choosing insulation materials or enclosing the interior.

Can I store hay and feed inside my horse barn?

You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.

How wide should the aisle in a horse barn be?

The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.

Definitions

◦ Tack Room
A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
◦ Stall Partition
A wall or divider separating one horse stall from another or from an adjacent area.
◦ Panel Gauge
A measurement related to sheet-metal thickness.
◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.
◦ Setback
The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
◦ Roof Pitch
The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
◦ Feed Room
A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
◦ Post-Frame Construction
A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
◦ Eave Height
The height of the barn's exterior wall where it meets the lower edge of the roof.
◦ Center Aisle
A passageway running through the barn, usually with stalls or other rooms along one or both sides.

Nevadum, Jasper County — At a Glance

Permit Authority Name
Jasper County Planning and Building Services Department
Permit Authority Url
https://www.jaspercountysc.gov/services/planning-and-building/
Permit Threshold Sqft
200
Setback Feet Side Rear
Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
Wind Load Zone
Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
Coastal
1
Drive Miles
79
Drive Minutes
93
Nearby Towns
Grahamville, Mitchellville, Bashan, Jasper
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

A horse barn involves more planning than choosing a roof and four walls. You have to think about the animals, the people caring for them and how the building will be used every day. Benton Metal Depot supplies metal panels, trim and related building materials for agricultural projects, allowing customers to coordinate those exterior materials with the rest of their barn plans.

Ready to talk through your horse barns project in Nevadum?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://www.jaspercountysc.gov/services/planning-and-building/ (2026)
  4. Jasper County Code § 20.90.060 (Improvement Location Permit), as cited by https://jasper.county.codes/JCC/20.90.060 and summarized by secondary sources: "residential accessory structures less than 200 square feet, commercial accessory structures less than 120 square feet" are exempt from a building permit (zoning/setback compliance still required). Verify against the primary code text directly. (2026)
  5. https://www.jaspercountysc.gov/services/planning-and-building/ordinances-regulations/ (2026)
  6. Aggregated from windload.solutions (South Carolina Wind Load Requirements) and general ASCE 7-16 coastal SC guidance — no Jasper County-specific primary map source found (2026)
  7. Given/client spec — Jasper County, SC is a coastal county (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.