Horse Barns in Ricetown 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

If you're building a horse barn in Ricetown, don't plan around stalls alone. You'll also need to think about airflow, water access, feed, tack and where the horses will enter and leave. Benton Metal Depot supplies metal building materials throughout Jasper, with 7 exterior colors available for applicable packages.

Key Points

  • ◦Horse barn exterior materials are available in 7 colors.
  • ◦Plan stall dimensions around the horses that will actually use them.
  • ◦Ventilation, drainage and access to fresh water should be considered during barn planning.
  • ◦Aisle width should allow horses and handlers to move comfortably and safely.
  • ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
As of 2026 · Source
Wind load zone Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels
As of 2026 · Source
Drive time from Statesboro 93
As of 2026 · Source

Permits & Setbacks in Jasper County

Barn placement is something to figure out before the ground is cleared. If you're planning a horse barn in Ricetown, contact Jasper County Planning and Building Services Department about the local requirements. The permit rule applies once the building exceeds 200 square feet, and the current setback is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).. You should also check whether any additional rules apply to keeping horses on the property before committing to a building location.

Delivery to Ricetown

Once you know what barn you need, the next step is getting the property ready for it. The typical lead time for a horse barn package to Ricetown is 1 to 2 weeks. Use that window to handle permits, access and any site preparation. If you're arranging grading or concrete work, coordinate those jobs with the building specifications and expected delivery schedule.

Metal horse barn by Benton Metal Depot

Representative product photo — a Jasper County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

What kind of metal panels does Benton use for horse barns?

The applicable horse barn package uses 29-gauge and 26-gauge Rib panels panels. Metal roofing and siding help enclose the building and protect it from the weather, but panel selection is only part of planning a barn. Ventilation, condensation control and the safety of surfaces horses can reach should also be addressed in the finished design.

How big should a horse barn be?

Start with the number and size of your horses, then add the space needed for safe handling and daily care. Stalls are only one part of the layout. You'll also need room for aisles, doors, feed, tack and possibly a wash area. If you expect to add horses later, think about that before choosing the building dimensions.

Can I store hay and feed inside my horse barn?

You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.

How wide should the aisle in a horse barn be?

The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.

Is a metal horse barn too hot for Georgia summers?

A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Ricetown, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.

Can I add a tack room and wash area to my horse barn?

Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.

How long does it take to get horse barn materials delivered?

Current delivery to Ricetown is estimated at 1 to 2 weeks. Use that window to work through permits, contractor schedules and site preparation. Confirm the estimate for your specific order when placing it and planning the overall construction schedule.

Do I need a permit for a horse barn in Ricetown?

The requirements for Ricetown are handled by Jasper County Planning and Building Services Department. Currently, a permit is required once the barn exceeds 200 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.

Definitions

◦ Lead Time
The period needed to process and prepare the building materials after the relevant order stage.
◦ Panel Gauge
A measurement related to sheet-metal thickness.
◦ Stall Partition
A wall or divider separating one horse stall from another or from an adjacent area.
◦ Tack Room
A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
◦ Eave Height
The height of the barn's exterior wall where it meets the lower edge of the roof.
◦ Feed Room
A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
◦ Post-Frame Construction
A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
◦ Roof Pitch
The slope of the barn roof, usually described by how much it rises over a set horizontal distance.
◦ Setback
The required distance between a barn and a property boundary, road or another feature covered by local building or zoning rules.
◦ Ridge Vent
A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.

Ricetown, Jasper County — At a Glance

Permit Authority Name
Jasper County Planning and Building Services Department
Permit Authority Url
https://www.jaspercountysc.gov/services/planning-and-building/
Permit Threshold Sqft
200
Setback Feet Side Rear
Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
Wind Load Zone
Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
Coastal
1
Drive Miles
79
Drive Minutes
93
Nearby Towns
Grahamville, Mitchellville, Bashan, Jasper
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal building products in Statesboro since 2004 and supplies materials for agricultural projects throughout the region. For someone planning a horse barn in Ricetown, that means working with a regional supplier familiar with metal roofing, siding and the materials used on farm buildings. The barn's design and animal-housing requirements should be worked out alongside the material specifications.

Ready to talk through your horse barns project in Ricetown?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
  3. https://www.jaspercountysc.gov/services/planning-and-building/ (2026)
  4. Jasper County Code § 20.90.060 (Improvement Location Permit), as cited by https://jasper.county.codes/JCC/20.90.060 and summarized by secondary sources: "residential accessory structures less than 200 square feet, commercial accessory structures less than 120 square feet" are exempt from a building permit (zoning/setback compliance still required). Verify against the primary code text directly. (2026)
  5. https://www.jaspercountysc.gov/services/planning-and-building/ordinances-regulations/ (2026)
  6. Aggregated from windload.solutions (South Carolina Wind Load Requirements) and general ASCE 7-16 coastal SC guidance — no Jasper County-specific primary map source found (2026)
  7. Given/client spec — Jasper County, SC is a coastal county (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.